Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T15PI00008
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/30/2015 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Completed | |
05/04/2015 | ESTEVAN TINEO | DOT ENGINEERING | REVIEW | Denied | 1. Include the proposed improvements along Broadway on this PIA plan. 2. Provide a standard type of access ramp at the nw corner of Leonora Ave and Broadway. 3. Detail how the existing median at Leonora will be modified to work with proposed raised median. 4. How will the proposed raised curbing impact existing drainage patterns? 5. Provide correpsonding profile view for proposed curbing. 6. How will proposed improvements impact existing monument structure located along the se corner of Leonora and 10th street? 7. Provide vertical curb to header transition for proposed radius curbing along Leonora and 10th. 8. Provide standard access ramp for proposed new curbing radius along Leonora and 10th. 9. Show existing traffic circle at the 10th and Leonora. How will curbing impact vehicular access at this intersection? |
05/11/2015 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | Is the new median island on Leonora a requirement? If it is installed and has landscape -the City can not maintain it and it will be the development's responsibility to maintain both the landscape and irrigation - this includes paying for water. Please submit landscape and irrigation plans on next submittal. Note: private irrigation lines can not cross public roadways. Therefore you will be required to install a new meter and backflow in the median. Please call me if you have questions - Gary 837-6618 GDW |
05/14/2015 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
05/14/2015 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
05/14/2015 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
05/14/2015 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
05/14/2015 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
05/14/2015 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
05/14/2015 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
05/14/2015 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
05/14/2015 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
05/26/2015 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Needs Review | Date: May 26, 2015 PROJECT NAME: Broadway Festival - Leonora Ave at Broadway Blvd PLAN #: I-2015-004 ACTIVITY NUMBER: T15PI00008 PROJECT REVIEWER: James Femling, City of Tucson Transportation Comments: The TDOT Streets & Traffic Maintenance Division has reviewed the PIA Plan and recommends resubmittal. The following comment need to be addressed prior to submitting the mylar plan set for final approval. 1. C - Typical Road Section, STA 11+01.23 - STA 12+39.91 Sheet 3 - New 2" minimum overlay or chip & slurry seal. If you have any questions, I can be reached at 791-3154 or James.Femling@tucsonaz.gov |
05/26/2015 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
05/26/2015 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed |