Plan Number: T15PI00004
Parcel: Unknown

Review Status: Completed

Review Details: PIA - RESUBMITTAL

Plan Number - T15PI00004
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/26/2015 GARY WITTWER DOT LANDSCAPE REVIEW Completed
05/26/2015 LINZUNZA UTILITY CLEARANCES COT STREETS DIVISION Denied
05/26/2015 LINZUNZA UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
05/26/2015 LINZUNZA UTILITY CLEARANCES PC WASTEWATER MGMT Completed
05/26/2015 LINZUNZA UTILITY CLEARANCES QUEST COMMUNICATION Denied
05/26/2015 LINZUNZA UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
05/26/2015 LINZUNZA UTILITY CLEARANCES COX COMMUNICATION Denied
05/26/2015 LINZUNZA UTILITY CLEARANCES SOUTHWEST GAS CORP Denied
05/26/2015 LINZUNZA UTILITY CLEARANCES EL PASO NATURAL GAS Completed
05/26/2015 LINZUNZA UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
06/23/2015 JOSE ORTIZ DOT TRAFFIC REVIEW Approved June 16, 2015

Subject: Offsite Improvements plans for Walmart Neighborhood Market @Tucson Blvd. & Drexel Rd.
PIA Plan I-2015-002 DSD Activity # T15PI00004
Project Reviewer: Zelin Canchola, TDOT

Traffic Engineering recommends approval of the PIA Plan.

If you have any questions, I can be reached at (520) 837-6659 or Zelin.Canchola@tucsaonaz.gov
06/25/2015 LINZUNZA DOT ENGINEERING REVIEW Denied June 23, 2015

Subject: Offsite Improvements plans for Walmart Neighborhood Market @Tucson Blvd. & Drexel Rd.
PIA Plan I-2015-002 DSD Activity # T15PI00004
Project Reviewer: Craig Saltzman, DOT Engineering Review Section

Note: All comment numbers refer to comment numbering from first submittal comments.

6) Repeat Comment: Use City of Tucson P.I.A. Guidelines & Check list - the guidelines can be found at http://www.tucsonaz.gov/files/transportation/PIA_Guidelines_&_Checklist.pdf

16) Repeat Comment: Sheet 4 of 13: PAVING SECTION - Match existing pavement structural section or better. See plans I-98-51 and I-81-59B. Show percent compaction of sub base (scarify?). Use City of Tucson/Pima County mix numbers in Structural Pavement Section.

1 ½" Mix #3
3 ½' Mix #1
6' AB
Scarify sub grade and compact?

17) Sheet 5 of 13: Include Detail for City of Tucson Thickened Edge Detail along edge of strip paving (2 Ft. wide and 1 Ft. thick tapering back to pavement section).
FYI - Thickened Edge :
A) 1 Ft. thick at outer pavement edge
B) Taper from outer pavement edge of 1 ft. to match thickness of pavement structural section in 2 Ft. (easy to cut in with a blade)

19) Repeat Comment: sheet 6 of 13: Use City of Tucson Plan and Profile layout.
Example : http://www.tucsonaz.gov/tdot/construction-plans-drawings?plan=I-85-083

21) Sheet. 6 & 7 of 13: Maintain gutter slope across driveways - Profile indicates slope rises at driveway and then slopes away. Current submittal percent slopes shown on profile need beginning and ending stations for slopes.

24) Sheet 7 of 13: RCP culvert call out Station, Out and Skew angle from Tucson Blvd. construction stationing.
Example: See
Plan I-81-059B, Sheet 11, Plan View Detail B-B

25) Sheet 7of 13: Avenida Malcote - saw cut limits past manhole to the west of manhole - use same distance as that used on sides.

26) Sheet 7 of 13: Island Transition to Turn Bay remove angle points and replace with horizontal curves - Sta. 18+97.67 and Sta. 20+03.73 (see plan I-81-59B sheet 5 for reference).

30) Sheet 9 of 13: Plan View - Call out 48" RCP Culvert and Station and out. See comment 24 above.

36) Sheet 8 of 13: Auto turn data needed to justify large 50 Ft. radius.

Please give me a call at (520) 837-6621 to set up meeting to discuss review comments prior to next submittal. Thanks E. Craig Saltzman
06/26/2015 LINZUNZA PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
06/26/2015 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved June 25, 2015

Subject: Offsite Improvement plans for Walmart Neighborhood Market @ Tucson Blvd. & Drexel Rd
PIA Plan I-2015-002 DSD Activity # T15PI00004
Project Reviewer: James Femling, COT Streets & Traffic Maint.

Comments: DOT Streets & Traffic Maintenance Division has reviewed the PIA plans and recommends approval.

If you have any questions, I can be reached at (520) 791-3154 or james.femling@tucsonaz.gov
___________________________________________________

Project Reviewer: Ernie Encinas, COT Streets & Traffic Maint. Electric Shop

Comments: DOT Streets & Traffic Maintenance Division Electric Shop has reviewed the PIA plans and recommends approval. Concerns have been addressed, no additional comments necessary.

If you have any questions, I can be reached at (520) 791-3154 or ernie.encinas@tucsonaz.gov
06/26/2015 LINZUNZA PIA COORDINATOR OUT TO CUSTOMER Completed