Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - RESUBMITTAL
Plan Number - T15PI00004
Review Name: PIA - RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/26/2015 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Completed | |
05/26/2015 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
05/26/2015 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
05/26/2015 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
05/26/2015 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
05/26/2015 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
05/26/2015 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
05/26/2015 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
05/26/2015 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
05/26/2015 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
06/23/2015 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approved | June 16, 2015 Subject: Offsite Improvements plans for Walmart Neighborhood Market @Tucson Blvd. & Drexel Rd. PIA Plan I-2015-002 DSD Activity # T15PI00004 Project Reviewer: Zelin Canchola, TDOT Traffic Engineering recommends approval of the PIA Plan. If you have any questions, I can be reached at (520) 837-6659 or Zelin.Canchola@tucsaonaz.gov |
06/25/2015 | LINZUNZA | DOT ENGINEERING | REVIEW | Denied | June 23, 2015 Subject: Offsite Improvements plans for Walmart Neighborhood Market @Tucson Blvd. & Drexel Rd. PIA Plan I-2015-002 DSD Activity # T15PI00004 Project Reviewer: Craig Saltzman, DOT Engineering Review Section Note: All comment numbers refer to comment numbering from first submittal comments. 6) Repeat Comment: Use City of Tucson P.I.A. Guidelines & Check list - the guidelines can be found at http://www.tucsonaz.gov/files/transportation/PIA_Guidelines_&_Checklist.pdf 16) Repeat Comment: Sheet 4 of 13: PAVING SECTION - Match existing pavement structural section or better. See plans I-98-51 and I-81-59B. Show percent compaction of sub base (scarify?). Use City of Tucson/Pima County mix numbers in Structural Pavement Section. 1 ½" Mix #3 3 ½' Mix #1 6' AB Scarify sub grade and compact? 17) Sheet 5 of 13: Include Detail for City of Tucson Thickened Edge Detail along edge of strip paving (2 Ft. wide and 1 Ft. thick tapering back to pavement section). FYI - Thickened Edge : A) 1 Ft. thick at outer pavement edge B) Taper from outer pavement edge of 1 ft. to match thickness of pavement structural section in 2 Ft. (easy to cut in with a blade) 19) Repeat Comment: sheet 6 of 13: Use City of Tucson Plan and Profile layout. Example : http://www.tucsonaz.gov/tdot/construction-plans-drawings?plan=I-85-083 21) Sheet. 6 & 7 of 13: Maintain gutter slope across driveways - Profile indicates slope rises at driveway and then slopes away. Current submittal percent slopes shown on profile need beginning and ending stations for slopes. 24) Sheet 7 of 13: RCP culvert call out Station, Out and Skew angle from Tucson Blvd. construction stationing. Example: See Plan I-81-059B, Sheet 11, Plan View Detail B-B 25) Sheet 7of 13: Avenida Malcote - saw cut limits past manhole to the west of manhole - use same distance as that used on sides. 26) Sheet 7 of 13: Island Transition to Turn Bay remove angle points and replace with horizontal curves - Sta. 18+97.67 and Sta. 20+03.73 (see plan I-81-59B sheet 5 for reference). 30) Sheet 9 of 13: Plan View - Call out 48" RCP Culvert and Station and out. See comment 24 above. 36) Sheet 8 of 13: Auto turn data needed to justify large 50 Ft. radius. Please give me a call at (520) 837-6621 to set up meeting to discuss review comments prior to next submittal. Thanks E. Craig Saltzman |
06/26/2015 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
06/26/2015 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | June 25, 2015 Subject: Offsite Improvement plans for Walmart Neighborhood Market @ Tucson Blvd. & Drexel Rd PIA Plan I-2015-002 DSD Activity # T15PI00004 Project Reviewer: James Femling, COT Streets & Traffic Maint. Comments: DOT Streets & Traffic Maintenance Division has reviewed the PIA plans and recommends approval. If you have any questions, I can be reached at (520) 791-3154 or james.femling@tucsonaz.gov ___________________________________________________ Project Reviewer: Ernie Encinas, COT Streets & Traffic Maint. Electric Shop Comments: DOT Streets & Traffic Maintenance Division Electric Shop has reviewed the PIA plans and recommends approval. Concerns have been addressed, no additional comments necessary. If you have any questions, I can be reached at (520) 791-3154 or ernie.encinas@tucsonaz.gov |
06/26/2015 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed |