| 02/04/2015 | LINZUNZA | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
| 02/04/2015 | LINZUNZA | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
| 02/04/2015 | LINZUNZA | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
| 02/04/2015 | LINZUNZA | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
| 02/04/2015 | LINZUNZA | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
| 02/04/2015 | LINZUNZA | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
| 02/04/2015 | LINZUNZA | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
| 02/04/2015 | LINZUNZA | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
| 02/04/2015 | LINZUNZA | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
| 02/18/2015 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | See redlines |
| 02/18/2015 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | Comments by: Estevan Tineo 837-6646 Please see my comments below: 1. Sheet 1 of 3: Please remove any references to City personal from City Notes. For example, note 4 (Sun Link Notes), should refer to DOT Engineering Permitting not Chris Leighton. Sheet 2 of 3: a. The new sidewalk area should consist of concrete sidewalk areas with brick bands, not brick sidewalk with concrete bands. b. Plan view should indicate actual dimensions for separation between existing curbing and existing track slab. c. For pedestrian safety, an handrail should be provided along the new curing alignment. d. The proposed roof drain system should include clean-outs for future maintenance. In addition, please verify that the positive drainage will be provided. e. Show existing striping and parking meters as applicable. Sheet 3 of 3: a. Show demolition limits needed to install proposed vertical curbing. Will the proposed curbing and improvements (including excavation needed to install curbing) impact any utilities, including SunLink underground power lines? b. Detail 5: Indicate any new striping and relocated parking meters. Esteban Carlos Tineo, P.E. DOT Engineering Review |
| 02/19/2015 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Passed | |
| 02/26/2015 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | See additional comments from Sun Link and Park Tucson. |
| 02/26/2015 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Passed | |
| 02/26/2015 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed | See additional comments from Sun Link and Park Tucson. |