Permit Number: T15OT00169
Parcel: 11204369A

Review Status: Completed

Review Details: FLOODPLAIN

Permit Number - T15OT00169
Review Name: FLOODPLAIN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/05/2015 ELEIBOL1 ENGINEERING REVIEW Approved February 5, 2015
FLOODPLAIN USE PERMIT NO.: T15OT00169
ADDRESS: 3050 E Fort Lowell Rd, Tucson, Arizona 85716
PROPERTY OWNER: Reay's Ranch Investors, LLC
2110 N Kolb Rd, Tucson AZ 85715

The use a portion of the FEMA Special Flood Hazard Area Zone AE per the Flood Insurance Rate Maps 04019C1693L, specifically described as:

A portion of Parcel 112-04-369A, E195' N210' NE4 EXC N60' & E50' THEREOF EXC SPNDRL IN NE COR .50 AC SEC 32-13-14

For the purpose of demolishing an existing gas station (canopy, concrete pad, bathrooms, convenience store).

The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard, and Watercourse Amenities, Safety and Habitat regulations, and is particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Unified Development Code, or any other Federal, State, County, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations and Watercourse Amenities, Safety, and Habitat regulations require the issuance of an additional Floodplain Use Permit.

The following 13 conditions apply to this permit:

1) This permit becomes invalid and is subject to additional floodplain review, if any required development changes the demolishing of the buildings, or, if there is any further disturbance within the floodplain other than that outlined in this application. This floodplain use permit may be subject to conditions or restrictions designed to reduce or mitigate the potential damage or hazard to life or property resulting from demolishing the commercial building within the regulatory floodplain, floodway or erosion hazard areas as determined by the project engineer and accepted by the City of Tucson.
2) Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties.
3) All work shall conform to the approved Details and General site plan sheets for the demolition of the building, which are made part of this permit.
4) The proposed demolition must comply with best management practices and not track sediment offsite into the public right-of-way per the ADEQ permit.
5) Within 5 (five) days of issuance of this permit, and through completion of the project, notification must be posted and maintained in a conspicuous place on the job site stating "CONSTRUCTION PROCEEDING UNDER REQUIREMENTS OF CITY OF TUCSON FLOODPLAIN USE PERMIT # T15OT00169. FOR INFORMATION PLEASE CALL 791-5550."
6) This Floodplain Use Permit and plans shall be kept in a readily accessible location on site at all times.
7) Any additional future disturbance or construction of the floodplain shall have separate floodplain use permit applications submitted to this office for review and approval.
8) See the associated activity T15BU00130.
9) This permit is specific to the improvements for 2110 N Kolb Rd as indicated on the approved plans. It shall not apply to any other structure or property, whether attached or unattached, not specified under this permit.
10) No work/activity for this site beyond June 1, 2015 (to avoid monsoons).
11) If there are any changes at site due to construction or other issues, additional review or permitting may be required. Contact PDSDS Engineering for any proposed changes.
12) Call for inspections of completed work to confirm that UST vents are a minimum of 5-ft above ground. 837-4934
13) Construction activity expected to last approximately 2 weeks for this permit, perhaps starting mid-February.

This Floodplain Use Permit will be automatically revoked and becomes invalid if conditions are not complied with, as set forth in this permit.

APPLICANT NAME: Cordova Environmental Engineering
PHONE: 480-620-2445

(EXPIRATION DATE) Month: 06 Day: 1 Year: 2015

SIGNATURE OF APPLICANT DATE

The applicant is authorized by the City Engineer to receive a floodplain use permit subject to the above referenced conditions and restrictions.

Final Status

Task End Date Reviewer's Name Type of Review Description
02/05/2015 SHANAE POWELL OUT TO CUSTOMER Completed