Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/WWM
Permit Number - T15CM08704
Review Name: RESIDENTIAL - BLDG/WWM
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/12/2016 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: T15CM08704 419 N. Tyndall Avenue Residential (1st Review) TRANSMITTAL DATE: January 12, 2016 The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. Zoning cannot approve the building plan until the Design Development Option (DDO), DDO16-01, has been approved. Once the above comment is addressed Zoning is willing to provide an over-the-counter review. Call or email to schedule this appointment. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
02/08/2016 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Reqs Change | T15CM08704 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, please provide two sets of updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2012 International Residential Code and 2012 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL COMMENTS: 1. All SFR and Duplex plans submitted after March 1, 2009 require a solar water system, or future installation preparation City of Tucson Ordinance #10549 with one of the following provisions: ½"control conduit and two ¾" copper piping for water with rooftop termination; straight 3" capped sleeve; or an accessible attic (clear path 30" wide x 30" high) over the water heater. Show appropriate notation. 2. All construction drawings submitted after June 1, 2010 for one- or two-family dwellings must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. Property with 200 to 400 SF of available distribution area requires piping for one gray water fixture, and a property with over 400 SF requires complete compliance. Notate "property has less than 200 SF available for gray water distribution" on the plans. 3. Provide a signed Confirmation of Notice of Demolition form before final processing of the building permit, R104.7. SITE PLAN: 1. Indicate the location of buildings, utility meters and gas, water, electric and sewer lines from property line to building, R106.1.1. Show the point of connection of proposed lines to the service lines for verifying correct sizes and necessary upgrades. FOUNDATION PLANS: 1. Show compliance with termite treatment, R318.2. ELEVATIONS: 1. Provide consistent information for the unvented conditioned attic space, R806. Remove the attic space vents (sheet A2) or provide an attic space ventilation calculation and relocate the insulation to the ceiling rather than the roof (sheet A4). MECHANICAL PLANS: 1. Provide demand calculations in accordance with Manual J/S/D standards, M1401.3, M1601.1. Systems shall be sized in accordance with Manual S based on building loads calculated in accordance with Manual J and duct systems sized in accordance with Manual D. If you have any questions please contact: Ken Van Karsen (520) 837-4912 City of Tucson Residential Plan Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/23/2016 | KROBLES1 | OUT TO CUSTOMER | Completed |