Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM08635
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/20/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The specified drinking fountain, Elkay EHFSA8L1Z, is a single station unit. Provide two drinking fountains, one for handicapped use and one for non-handicapped use. [Initial comment: Provide the number of drinking fountains that complies with the requirements of Section 1109.5.1, IBC 2012 and Section 410.2, IPC 2012.] 2. An existing water heater is identified in room 110/111 but it is not clear that it is supplying hot water (or tempered water) to the new sinks (P-3). [Initial comment: Verify that hot or tempered water is provided to the sinks (P3) and that the source of the hot or tempered water is within 50 feet of the new fixtures. Reference: Sections 607.1 and 607.2, IPC 2012.] 3. It is not clear how the sink (P3) in room 105 is to be vented. [Initial comment: Clarify how the sink (P3) in room 105 is to be vented. Reference: Section 901.2.1, IPC 2012.] |
| 01/20/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 01/20/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide an economizer for the proposed heat pump. Reference: Section C403.3.1, IECC 2012. [Initial comment: Show that the proposed heat pump system meets the system and control requirements of Sections C403.2 and C403.3, IECC 2012. Reference: Section C303.1, International Energy Conservation Code 2012.] 2. The electrical design does not provide power to EF-1; coordinate with the electrical design. [Initial comment: Verify that power is being supplied to EF-1 and describe the sequence of operation for the fan. Reference: Section 107.2.1, IBC 2012.] |