Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: PLANS OK TO SUBMIT - RES
Permit Number - T15CM08534
Review Name: PLANS OK TO SUBMIT - RES
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/13/2016 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Reqs Change | T15CM08534 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, we request that you please provide revised plans and calculations, highlighting any changes, along with a written response to each of the noted items indicating action taken. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2012 International Residential Code, 2012 International Fire Code, 2011 National Electrical Code and Arizona Revised Statutes. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. DIAGRAMS / CALCULATIONS 1. Show the sum of the main and backfeed breakers not exceeding 120% of the busbar (and conductor) rating, NEC 690.64 & 705.12 (D). The distribution panel bus and extended bus conductor (6) requires a rating for receiving electrical power from two sources. Show the panel rating and a minimum 83 AMP feeder rating when placed between source breakers of 40A & 60A. (83A conductor x 120% equal or greater than 40A + 60A), or move the backfeed breaker to the service panel. If you have any questions please contact: Ken Van Karsen (520) 837-4912 City of Tucson Residential Plan Review |
12/21/2015 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
12/22/2015 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Approved |