Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM08285
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/24/2015 | DAVID RIVERA | ZONING | REVIEW | Approved | |
11/24/2015 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Approved | |
11/25/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
11/25/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations that justify the capacity of the equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012. 2. Show that the new rooftop unit has a thermostatic control that provides for off-hour and set-back control, automatic shutdown and start-up control and, if the control does not require manual changeover from the heating and cooling modes, restricts set point overlap. Reference: Section C403.2.4, IECC 2012. |
11/25/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
11/25/2015 | MARTIN BROWN | FIRE | REVIEW | Approved | |
11/25/2015 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
11/25/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
12/04/2015 | AROMERO4 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review |