Permit Number: T15CM08231
Parcel: 141186190

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T15CM08231
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/17/2016 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. The submitted sheet 3 of 3 of the Private Utility Plan, dated 10/20/15, appears to be an old version that does not include any storm drain connection for the roof drain leaders. Clarify how you plan to coordinate the civil, architectural, and plumbing designs. [Initial comment: Include a site plan showing the installation of the building sewer, water service, and all other utility services to the building (i.e. sheet 3 of 3 of the Private Utility Plan) as part of the building plan, not just as a reference drawing. Reference: Section 107.2.1, IBC 2012.]
2. If the roof drains are to connect to a storm drain system, provide a cleanout at the base of each roof drain stack. Reference: Sections 708.3.4 and 1101.8, IPC 2012. [Initial comment: Coordinate the termination point for the primary roof drain leaders with the architect. Flatwork plan 1/A-1 and detail 5/A-1 show the primary roof drain leaders terminating at the curb face with a sidewalk scupper. Reference: Section 107.2.1, IBC 2012.]
03/01/2016 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved