Permit Number: T15CM08231
Parcel: 141186190

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T15CM08231
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/27/2015 MARTIN BROWN FIRE REVIEW Approved
12/10/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Include a site plan showing the installation of the building sewer, water service, and all other utility services to the building (i.e. sheet 3 of 3 of the Private Utility Plan) as part of the building plan, not just as a reference drawing. Reference: Section 107.2.1, IBC 2012.
2. Coordinate the termination point for the primary roof drain leaders with the architect. Flatwork plan 1/A-1 and detail 5/A-1 show the primary roof drain leaders terminating at the curb face with a sidewalk scupper. Reference: Section 107.2.1, IBC 2012.
12/10/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
12/10/2015 ROBERT SHERRY WATER REVIEW Completed
12/15/2015 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET A-1; BUILDING SHELL CODE REVIEW: THE CORRIDOR FIRE RESISTANCE RATING REFERENCES THE IBC SECTION 1016.1. PLEASE REVISE THE REFERENCE SECTION NUMBER.
2. SHEET A-2; DOOR SCHEDULE: PLEASE ADD DOOR 100I TO THE SCHEDULE.
3. SHEET A-2; FLOOR PLAN: PLEASE MOVE DOOR NUMBERS 100N AND 100O ON THE PLAN.
4. SHEET A-2; DOOR SCHEDULE: PLEASE ADD DOOR 100O TO THE SCHEDULE.
5. SHEET A-2; DOOR TYPES: SHOULD THE DOOR TYPE 2 BE DESIGNATED AS 3? THE DOOR SCHEDULE DOES NOT INDICATE ANY TYPE 2 DOORS.
6. SHEET A-2; FLOOR PLAN KEYNOTES: PLEASE VERIFY NOTES 1, 8, 10, AND 12 ARE ON THE FLOOR PLAN.
7. SHEET A-2; FLOOR PLAN: ON THE NORTH WALL BETWEEN GRIDS 1 AND 2, THERE IS A REFERENCE TO 100P. WHAT IS THIS?
8. SHEET S1.0; STRUCTURAL NOTES (FOUNDATIONS): NOTES 1 THROUGH 3 INDICATE A GEOTECHNICAL REPORT WAS USED ON THIS DESIGN. PLEASE PROVIDE THAT REPORT FOR REVIEW.
9. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
12/16/2015 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
12/17/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
12/21/2015 LOREN MAKUS ENGINEERING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
02/16/2016 KROBLES1 OUT TO CUSTOMER Completed