Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T15CM08231
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/27/2015 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 12/10/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Include a site plan showing the installation of the building sewer, water service, and all other utility services to the building (i.e. sheet 3 of 3 of the Private Utility Plan) as part of the building plan, not just as a reference drawing. Reference: Section 107.2.1, IBC 2012. 2. Coordinate the termination point for the primary roof drain leaders with the architect. Flatwork plan 1/A-1 and detail 5/A-1 show the primary roof drain leaders terminating at the curb face with a sidewalk scupper. Reference: Section 107.2.1, IBC 2012. |
| 12/10/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 12/10/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 12/15/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A-1; BUILDING SHELL CODE REVIEW: THE CORRIDOR FIRE RESISTANCE RATING REFERENCES THE IBC SECTION 1016.1. PLEASE REVISE THE REFERENCE SECTION NUMBER. 2. SHEET A-2; DOOR SCHEDULE: PLEASE ADD DOOR 100I TO THE SCHEDULE. 3. SHEET A-2; FLOOR PLAN: PLEASE MOVE DOOR NUMBERS 100N AND 100O ON THE PLAN. 4. SHEET A-2; DOOR SCHEDULE: PLEASE ADD DOOR 100O TO THE SCHEDULE. 5. SHEET A-2; DOOR TYPES: SHOULD THE DOOR TYPE 2 BE DESIGNATED AS 3? THE DOOR SCHEDULE DOES NOT INDICATE ANY TYPE 2 DOORS. 6. SHEET A-2; FLOOR PLAN KEYNOTES: PLEASE VERIFY NOTES 1, 8, 10, AND 12 ARE ON THE FLOOR PLAN. 7. SHEET A-2; FLOOR PLAN: ON THE NORTH WALL BETWEEN GRIDS 1 AND 2, THERE IS A REFERENCE TO 100P. WHAT IS THIS? 8. SHEET S1.0; STRUCTURAL NOTES (FOUNDATIONS): NOTES 1 THROUGH 3 INDICATE A GEOTECHNICAL REPORT WAS USED ON THIS DESIGN. PLEASE PROVIDE THAT REPORT FOR REVIEW. 9. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 12/16/2015 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 12/17/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 12/21/2015 | LOREN MAKUS | ENGINEERING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/16/2016 | KROBLES1 | OUT TO CUSTOMER | Completed |