Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 2ND
Permit Number - T15CM08217
Review Name: REVISION - - 2ND
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/20/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide complete descriptions for each proposed plumbing fixture. Reference: Section 402, IPC 2012 and Section 107.2.1, IBC 2012. 2. Revise the drainage fixture units for the wash sink (WS-1) to be 2.0 drainage fixture units per each set of faucets. Reference: Table 709.1, IPC 2012. 3. Revise the water fixture units for the wash sink (WS-1) to be 2.0 water fixture units per each set of faucets. Reference: Table E103.3 (2), IPC 2012. 4. If the flush valves have been eliminated from the building, recalculate the water demand using Table E103.3 (3) for systems predominantly for flush tanks. 5. The drainage fixture units for a waterless urinal is not zero; see Table 709.1, IPC 2012. |