Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T15CM07560
Parcel: 10706002K

Review Status: Active

Review Details: COMMERCIAL - TI

Permit Number - T15CM07560
Review Name: COMMERCIAL - TI
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
11/04/2015 MARTIN BROWN FIRE REVIEW Approved
11/06/2015 LOREN MAKUS ENGINEERING REVIEW Denied Development Package must be approved first.
11/10/2015 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: 902 W. Miracle Mile
T15CM7560
Building Plan (1st Review)

TRANSMITTAL DATE: November 10, 2015

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. The proposed building expansion requires a development package to be submitted and approved prior to the building plan.

3. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
11/17/2015 ROBERT SHERRY WATER REVIEW Completed
11/18/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide a cleanout for the section of the building sewer located immediately downstream of the hydromechanical grease interceptor. Reference: Section 708.3.2, IPC 2012.
2. Clarify how access is to be provided to the flow control device. Reference: Section 1003.4.2, IPC 2012.
11/18/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide energy code compliance calculations for the addition to the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-values of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Fenestration components shall have NFRC-certified U-values and Solar Heat Gain Coefficients. Reference: Sections C101.4.3, C101.5, C103.2, and C303, International Energy Conservation Code 2012.
2. Verify that the thermostatic control for the rooftop unit provides for automatic start-up control and, if the control does not require manual changeover from the heating and cooling modes, restricts set point overlap. Reference: Section C403.2.4, IECC 2012.
3. Provide structural calculations and details to demonstrate that the installation of the new rooftop mechanical equipment will not adversely affect the structural integrity of the roof. Reference: Section 302.1, IMC 2012.
4. Provide structural calculations and details to show that the Type I hood is supported from the building structure in accordance with Section 507.6, IMC 2012 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2012.
5. Show that the hood installation complies with Section 507.9, IMC 2012 with regard to a smooth, cleanable, non-absorbent, and non-combustible material installed between the hood and the wall, and extending 18" beyond the hood.
6. The mechanical plan shows a high velocity diffuser for the room air conditioning system in close proximity to the face of the Type I hood. Verify that the location and type of air outlet complies with the hood manufacturer's installation instructions and does not reduce the effectiveness of the exhaust system. Reference: Sections 304.1 and 508.1, IMC 2012.
11/18/2015 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET A1.0; SUMMARY OF GOVERNING REGULATIONS: PLEASE REVISE THE ACCESSIBILITY CODE TO THE 2009 EDITION AND REVIEW THE PLANS FOR CONFORMANCE.
2. SHEET A2.0; FLOOR PLAN: IS THIS NEW ADDITION A KITCHEN OR A RESTAURANT? PLEASE VERIFY. IT APPEARS FOOD WILL BE SERVED FROM THIS ADDITION.
3. SHEET A2.0; FLOOR PLAN: WILL THERE BE SEATING AND TABLES IN THE COVERED PATIO AREA? PLEASE VERIFY. THIS COULD AFFECT THE OCCUPANT LOAD, EXITING, ACCESSIBILITY, ETC.
4. SHEET A2.0; DEMOLITION PLAN KEYNOTES: THE NOTE UNDER THE TITLE REFERENCES SHEET A0.0 FOR RESTROOM DIMENSIONS. PLEASE REVISE THE SHEET REFERENCE.
5. SHEET A2.0; FLOOR PLAN: PER THE IBC SECTION 1210.4, TOILET ROOMS SHALL NOT OPEN DIRECTLY INTO A ROOM USED FOR FOOD PREPARATION. PLEASE REVISE THE PLAN.
6. SHEET A4.0; ELEVATION 2: PLEASE INDICATE THE TOILET PAPER DISPENSER ON THIS ELEVATION.
7. SHEET A5.0; BUILDING SECTION 1: A DETAIL AT THE CANOPY REFERENCES 4/S2.0. PLEASE REVISE THAT REFERENCE.
8. SHEET A5.0; WEST BUILDING ELEVATION: ON THE RIGHT SIDE OF THIS ELEVATION, A KEYNOTE AT THE ROOF REFERENCES NOTE 6. PLEASE REVISE THAT REFERENCE.
9. SHEET A5.0; WEST BUILDING ELEVATION: IS THE WINDOW (NOTE 8) A PICK-UP WINDOW? PLEASE VERIFY.
10. SHEET S2.0; ROOF FRAMING PLAN: PLEASE PROVIDE A DETAIL ON THIS SHEET FOR THE CONNECTION OF THE NEW WOOD BEAM (W2 AT THE SOUTH END) TO THE EXISTING STRUCTURE (AT THE EAST END OF W2).
11. SHEET S2.0; DETAIL 2: THIS DETAIL INDICATES THE EXISTING MASONRY HAS A SOLID GROUTED COURSE AT THE NEW EPOXY BOLT LOCATIONS. SHOULD THERE BE A NOTE ON THE DETAIL IF THE WALL IS NOT SOLIDLY GROUTED AT ALL EPOXY BOLT LOCATIONS? PLEASE VERIFY.
12. SHEET S2.0; ROOF FRAMING PLAN: PLEASE INDICATE ON THE PLAN THE LOCATION AND WEIGHTS OF THE NEW MECHANICAL EQUIPMENT PER SHEET M1.1.
13. SHEET S2.0; ROOF FRAMING PLAN: PLEASE INDICATE ALL OPENINGS IN THE ROOF DUE TO MECHANICAL EQUIPMENT. INCLUDE A DETAIL ON THE DRAWINGS FOR THE FRAMING AROUND THOSE OPENINGS.
14. SHEET S2.0; ROOF FRAMING PLAN: PLEASE INDICATE ON THE PLAN THE EXHAUST HOOD LOCATION AND WEIGHT. INCLUDE A DETAIL ON THE DRAWINGS FOR THE SUPPORT OF THAT HOOD.
15. STRUCTURAL CALCULATIONS; SHEET 1 (GEOTECHNICAL): PLEASE REVISE THE BEARING PRESSURE VALUE TO 1000 PSF PER THE ACTUAL CALCULATIONS AND THE GENERAL STRUCTURAL NOTES.
16. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
11/18/2015 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Approved
11/19/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
11/02/2015 ANY REJECT SHELF RECEIVED