Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T15CM06376
Parcel: 121136270

Review Status: Completed

Review Details: 3RD PARTY REVIEW - COMMERCIAL

Permit Number - T15CM06376
Review Name: 3RD PARTY REVIEW - COMMERCIAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/22/2015 KEN BROUILLETTE FIRE REVIEW Reqs Change 1. The cover page indicates building is not fire sprinklered, but it appears throughout the drawings that it is, please clarify.
2. Please provide specs on the KILN
3. Sheet A1.1, the occupant load factor is incorrect. Please refer to Table 1004.1.2 of the IFC/IBC
4. The fire alarm specs include covering a hood suppression system. The mechanical plans do not indicate a Type I hood. Is a type I hood with fire suppression system going to be installed? If not, what exception will be used?
5. The reception door 1 should swing in the direction of exit travel. Confusion exists on sheets A1.1 and E1.1.
6. Sheet A6.2, I can't find Door 20 on Schedule.
7. Please make a note that a manual fire alarm system is required per Section 907.2.6
8. Why is a murphy bed proposed? Is this to be used for overnight sleeping accomodations?

Please make corrections and resubmit to third party and PDSD for Fire Review-Ken B
09/22/2015 LOREN MAKUS ENGINEERING REVIEW Needs Review DP must be approved first.
09/22/2015 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
Principal Planner

PROJECT: T15CM06356
5101 E Farness Drive
Proposed Adult Day Care Use

TRANSMITTAL DATE: September 22, 2015

DUE DATE: September 22, 2015

COMMENTS:

01. Zoning has done a cursory review of the building plans for compliance with the proposed Development Package Site plan.

02. The development package was not submitted for plan review therefore until the DP is reviewed and approved the building plans cannot be approved by Zoning.

03. Ensure that the DP has been drawn to comply with the Administrative Manual Standards 2-06. The DP and the building plans shall be separated into two separate plans sets, DP and Building plan set.


If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.
09/25/2015 CPIERCE1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
10/19/2015 STANTEC 3RD PARTY REVIEW-COMMERCIAL AT 3RD PARTY OFFICE Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
10/19/2015 KROBLES1 OUT TO CUSTOMER Completed