Permit Number: T15CM06270
Parcel: 11445262J

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T15CM06270
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/17/2015 MARTIN BROWN FIRE REVIEW Reqs Change Second exit from A-2 occupancy requires panic hardware.
09/17/2015 MARTIN BROWN FIRE REVIEW Reqs Change Second exit from A-2 occupancy requires panic hardware.
09/22/2015 PAUL BAUGHMAN ENGINEERING REVIEW Reqs Change DATE: September 22, 2015
DUE DATE: October 6, 2015
SUBJECT: Tanque Verde Shopping Center
TO: Gene Goldstein, RE
LOCATION: 7073 E Tanque Verde Road
REVIEWERS: Paul Baughman, PE, CFM
ACTIVITY: T15CM06270
SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed the proposed Development Plan Package. The following items need to be addressed:
1) Please note that a drainage statement was submitted with this plan set. Per AM 2-06.4.9N this should be submitted with the Development Package (DP15-0153). Please submit a copy of this report with the next submittal of the Development Package along with the response to the other comments issued.
2) Per AM 2-06.4.3 please update the "index to drawing" to show the "DP15-0136 (Sheet 3 of 9)" number instead of "DP3 of 9" under sheet number for number 2. This should then be noted as per separate plan set.
3) Per AM 2-06.2.3 this is a related review and the development plan package, DP15-153, will need to be approved prior to or concurrently with approval of this activity number T15CM06270.
4) Per TSM 7-01.4.3E please update Exterior elevation note 13 on sheet A2.1 to indicate that the roof downspout is to be discharged beneath the sidewalk/pedestrian way.

If you have any comments questions or wish to discuss new information, please call or email me at 520-837-5007 or paul.baughman@tucsonaz.gov.
09/28/2015 CLAYTON TREVILLYAN BUILDING-COMMERCIAL REVIEW Reqs Change BUILDING PLAN REVIEW COMMENTS
Date: 10-1-15
Activity: T15CM06270
Address: 7073 E Tanque Verde Rd
Applicant: Metro TED

This letter reflects comments to be addressed. The purpose of this review is to verify compliance to the 2012 International Building Code and local amendments. Plans must be of sufficient clarity to indicate the location, nature and extent of the work proposed, 102.2.1. In order to facilitate a shorter back check time, we request that you please provide two complete sets of revised plans and calculations, along with a written response to each of the noted items indicating action taken. Other comment references may be derived from additional codes and standards adopted by The City of Tucson. All features have been checked only to the extent allowed by the submittals provided for review. All portions of this project are assumed to meet other departmental requirements, conditions and concerns before permit approval.

Sheet TS1:
1. Please clarify on the site plan which of the two shaded (new) buildings indicated will apply to this project.
2. Provide the minimum accessible parking necessary for the quantity of parking spaces provided, 1106.1.
3. Please specify the distance between the proposed building and the adjoining property lines or imaginary property lines used to determine fire separation distance in accordance with Table 602.
4. Please correct the code year specified for the National Electric Code to the currently adopted version of 2011.

Sheet A1.0
5. Provide a window schedule consistent with the window references provided.

Sheet A4.0
6. Show the location of the attic access opening to the unoccupied tower area, 1209.2.
7. Provide an attic ventilation calculation for sizing the ventilation of the tower attic space, 1203.2.
8. Please correct the mislabeled section drawings. Details number 1 & 2 are not consistent with references located on various other sheets of construction plan.

Sheet S2.0
9. Specify the spacing of the anchor bolting consistent with the shear wall schedule found in the structural calculations.

Sheet S3.0
10. Please correct the carpentry note 'f' to reference the 2012 International Building Code as adopted by the City of Tucson.

If you have any questions please contact:
Clayton Trevillyan, CBO
520.837.4913
Clayton.Trevillyan@tucsonaz.gov
10/01/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Provide the civil plans referenced on sheet MP1.0 that show the location of the water meter and backflow preventer, the route, slope, cleanout locations, and the point of connection to the public or private sewer system. Reference: Section 107.2.1, IBC 2012.
10/01/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Revise the energy code analysis for the building envelope, coordinating the building components used in the analysis with those shown on the drawing (e.g. the COMcheck envelope compliance certificate is based on 8" concrete block walls with wood furring and R-11 cavity insulation but the drawings call for wood stud walls with no insulation at this time). If the energy code compliance is meant to apply to the building after the tenant improvements, specify the insulation requirements that will have to be installed at that time to justify the energy efficiency of the building as shown in the COMcheck envelope compliance certificate. Reference: Section C303.1, IECC 2012, as amended by the City of Tucson.
2. None of the fenestration components (doors and glazing) have NFRC product ratings. Provide NFRC fenestration product ratings for the U-factor and the SHGC values on COMcheck or use the appropriate default U-factor and SHGC values from Tables C303.1.3 (1), C303.1.3 (2) and C303.1.3.(3), IECC 2012. For site assembled commercial products, the NFRC component modeling approach program enables commercial window manufacturers to produce bid reports to prove energy performance prior to being awarded a job and provide finalized label certificates once the product has been installed. Reference: Section C303.1.3, IECC 2012.
3. Economizers are not required for simple HVAC systems that are expected to operate less than 20 hours per week. If the energy code compliance is meant to apply to the mechanical systems after the tenant improvements, show how the proposed HVAC systems are likely to operate less than 20 hours per week. Reference: Section C403.3.1 (4), IECC 2012.
10/01/2015 ROBERT SHERRY WATER REVIEW Completed
10/05/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
10/13/2015 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Shell Building - 7073 E. Tanque Verde Road
T15CM6270
Building Plan (1st Review)

TRANSMITTAL DATE: October 13, 2015

1. The building plan have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. It appears that the plans match development package DP15-0153 but cannot be approved until the development package is approved.

3. Zoning will not approve until all other PDSD agencies have approved the building plan.

4. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

Final Status

Task End Date Reviewer's Name Type of Review Description
10/30/2015 KROBLES1 OUT TO CUSTOMER Completed