Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T15CM06242
Parcel: 12801005H

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T15CM06242
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/08/2015 MICHAEL ST. PAUL ZONING REVIEW Approved
09/08/2015 JASON GREEN ENGINEERING REVIEW Approved
09/08/2015 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET D1.0: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. PLEASE REVISE THIS SHEET.
2. SHEET A1.0: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. PLEASE REVISE THE CONSTRUCTION PLAN.
3. SHEET A5.1; STOCK SHELVING: FOR UNITS OVER 6 FEET TALL UP TO 12 FEET TALL, PROVIDE A DETAIL ON THE DRAWINGS (OR PROVIDE THE FIXTURE SPECIFICATIONS) FOR THE CONNECTION OF THE SHELF TO THE FLOOR.
4. GENERAL: BELOW THE PROFESSIONAL REGISTRANT'S SEAL, PLEASE PROVIDE THE EXPIRATION DATE OF THE LICENSE.
5. GENERAL: SHEET M1 INDICATES THE GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING AN ANALYSIS BY A STRUCTURAL ENGINEER OF THE EXISTING ROOF STRUCTURE TO DETERMINE IF THE ROOF CAN SAFELY SUPPORT THE NEW MECHANICAL LOADS. THIS WAS NOT PROVIDED.
6. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
09/08/2015 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
09/09/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Show that the proposed HVAC system meets the requirements of Sections C403.2, C403.3 (e.g. provide the mechanical energy code compliance certification from COMcheck). Reference: Section C303.1, International Energy Conservation Code 2012.
2. Verify that the specified thermostatic controls for the new rooftop units provide for off-hour and set-back control, automatic shutdown and start-up control and, if the controls do not require manual changeover from the heating and cooling modes, restrict set point overlap. Reference: Section C403.2.4, IECC 2012.
3. Provide structural calculations and details to demonstrate that the installation of the two new rooftop units will not adversely affect the structural integrity of the roof. Reference: Section 302.1, IMC 2012.
4. Condensate drains shall be terminated at an approved disposal location (i.e. a splash block on the roof is not acceptable). Reference: Section 307.2.1, IMC 2012, as amended by the City of Tucson.
5. Provide exhaust for the fitting room. Reference: Section 403.3, IMC 2012.
09/09/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide an approved vacuum relief valve for the scheduled bottom-fed water heater which is located above the fixture outlets. Reference: Section 504.2, IPC 2012.
2. Coordinate the stack diagram (2/M2.0) with the plumbing plan (6/M2.0).
09/09/2015 MARTIN BROWN FIRE REVIEW Approved
09/09/2015 ROBERT SHERRY WATER REVIEW Completed
09/10/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Denied Please Update Electrical Registrant Seal .