Permit Number: T15CM06147
Parcel: 14042002A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T15CM06147
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/03/2015 STEVE SHIELDS ZONING REVIEW Approved
09/03/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2012.
2. Provide an exhaust vent for the clothes dryer.
09/03/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Provide full compliance with the IECC for the interior lighting.
09/03/2015 ROBERT SHERRY WATER REVIEW Completed
09/03/2015 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET T1; DEVELOPMENT DATA: PLEASE PROVIDE THE PLUMBING FIXTURE CALCULATIONS ON THE DRAWINGS AND VERIFY CODE REQUIREMENTS ARE MET.
2. SHEET A2; FLOOR PLAN: PLEASE PROVIDE OCCUPANT LOADS FOR TRAINING ROOMS 68 AND 69. VERIFY THE DOOR SWINGS AT THE INTERIOR ARE CORRECTLY SHOWN PER THE IBC SECTION 1008.1.2.
3. SHEET A5; HEADER DETAIL 1: PLEASE PROVIDE A STRUCTURAL CALCULATION FOR THE HEADER DESIGN.
4. GENERAL: PLEASE PROVIDE AN EXITING PLAN ON THE DRAWINGS INDICATING THE PATHS OF EGRESS AND THE NUMBER OF OCCUPANTS AT EACH EXIT.
5. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
09/03/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Where is P7 located? Does the proposed ice maker require a backflow preventer or an indirect waste receptor?
09/03/2015 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
09/04/2015 JASON GREEN ENGINEERING REVIEW Approved
09/04/2015 MARTIN BROWN FIRE REVIEW Approved