Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM05950
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/26/2015 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Bank of America - 4201 N. Oracle Accessibility Review - On Site Only Development Package (1st Review) T15CM05950 TRANSMITTAL DATE: August 26, 2015 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Accessibility Review Section comments were addressed. Provide an accessible route from the accessible parking space to the accessible entrance(s) of the building. Provide a note to that effect, that all accessible route slopes are to comply with ICC A117.1, Section 403.3; 5% maximum running slopes and 2% maximum cross slopes. Provide a large scale sign detail including a van accessible sign. Provide running slope directional arrows, running slope percentages, cross slope directional arrows and cross slope percentages for all surfaces along the required accessible route from the proposed building entrance to the sidewalk located in the right-of-way per ICC A117.1-2009 403.3 and IBC 107.2.1 Provide details for all proposed accessible ramps, IBC 107.2.1. so that the requirements of IBC Chapter 11 and ICC A117.1-2009 can be verified. |
| 08/26/2015 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 08/28/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 08/28/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 08/28/2015 | CLAYTON TREVILLYAN | BUILDING-COMMERCIAL | REVIEW | Completed | |
| 08/28/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 08/28/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 08/28/2015 | CTREVIL1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 09/01/2015 | KEN BROUILLETTE | FIRE | REVIEW | Approved |