Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM05920
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/25/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide the following: #1. Provide for occupancy sensers or automatic switching for lighting control in the offices as required per IECC sec. 405.2.2.2. #2. Indicate,conductor and conduit types, sizes, and wiring methods for extending the feeders to the new Panel 'A' location. #3. Provide a complete panel schedule as required per COT plan submittal requirments. Ref; IBC sec. 107.2.1, NEC art.300, 408. |
| 08/25/2015 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
| 08/31/2015 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 08/31/2015 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 09/01/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 09/01/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Assuming the split system A/C is new: a. Show the location of the condensing unit b. Show how the air handler is attached to the structure c. Show how the refrigerant circuit access ports of the condensing unit has been secured to prevent unauthorized access. Reference: Section 1101.10, IMC 2012. d. Provide cooling and heating load calculations for the space e. Demonstrate compliance with the energy code (i.e. COMcheck) f. Specify the controls for the A/C unit. g. Clarify the height of the outside air opening and show how the opening is protected. Reference: Sections401.4 and 401.5, IMC 2012. 2. Provide the sequence of operation for the restroom exhaust fans. |
| 09/01/2015 | CLAYTON TREVILLYAN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Walk thru comments: 1. Doors may not swing into the clear floor space required for a restroom, ANSI A117.1, 603.2.2 |
| 09/09/2015 | KROBLES1 | WATER | REVIEW | Needs Review | |
| 09/09/2015 | KROBLES1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Reqs Change |