Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T15CM05920
Parcel: 14027038C

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T15CM05920
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/25/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please provide the following:
#1. Provide for occupancy sensers or automatic switching for lighting control in the offices as required per IECC sec. 405.2.2.2.
#2. Indicate,conductor and conduit types, sizes, and wiring methods for extending the feeders to the new Panel 'A' location.
#3. Provide a complete panel schedule as required per COT plan submittal requirments.
Ref; IBC sec. 107.2.1, NEC art.300, 408.
08/25/2015 KEN BROUILLETTE FIRE REVIEW Approved
08/31/2015 STEVE SHIELDS ZONING REVIEW Approved
08/31/2015 LOREN MAKUS ENGINEERING REVIEW Approved
09/01/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
09/01/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Assuming the split system A/C is new:
a. Show the location of the condensing unit
b. Show how the air handler is attached to the structure
c. Show how the refrigerant circuit access ports of the condensing unit has been secured to prevent unauthorized access. Reference: Section 1101.10, IMC 2012.
d. Provide cooling and heating load calculations for the space
e. Demonstrate compliance with the energy code (i.e. COMcheck)
f. Specify the controls for the A/C unit.
g. Clarify the height of the outside air opening and show how the opening is protected. Reference: Sections401.4 and 401.5, IMC 2012.

2. Provide the sequence of operation for the restroom exhaust fans.
09/01/2015 CLAYTON TREVILLYAN BUILDING-COMMERCIAL REVIEW Reqs Change Walk thru comments:
1. Doors may not swing into the clear floor space required for a restroom, ANSI A117.1, 603.2.2
09/09/2015 KROBLES1 WATER REVIEW Needs Review
09/09/2015 KROBLES1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Reqs Change