Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T15CM05780
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/15/2015 | CLAYTON TREVILLYAN | BUILDING-COMMERCIAL | REVIEW | Completed | |
10/15/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
10/15/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed. [Initial comment: Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2012.] 2. Comment not addressed. [Initial comment: Provide a site drawing showing the size, route, and slope of the building sewer and the location of its connection to the public sewer. Reference: Section 107.2.1, IBC 2012.] 3. Revise the roof drainage calculations to include the surrounding parapet walls and the contributory areas. The minimum dimension for a scupper is 4". Scuppers are not gutters; provide hydraulic calculations to limit the ponding on the roof to a depth acceptable to the structural engineer. [Initial comment: Provide roof drainage and hydraulic scupper size calculations based on the 100-year hourly rainfall rate for Tucson, 3" per hour. Show how overflow protection will be provided for the roof. Reference: Sections 1106.1, 1106.4, and 1108.3, IPC 2012.] |
10/15/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. The fenestration components used in the envelope compliance certificate did not include documentation of the NFRC certification required by the 2012 IECC. Provide a note on the drawings showing the U-value and Solar Heat Gain Factors used in the envelope compliance certificate and stating that the fenestration components used in the building must have NFRC-certified U-value and Solar Heat Gain Factors that are at least equal to those shown on the drawings. [Initial comment: Demonstrate energy code compliance for the new building envelope based on the current code. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012.] 2. The envelope compliance certificate indicates that high efficiency HVAC components are to be used to comply with the requirements of Section C406.2, IECC 2012. The proposed packaged A/C units with gas heat will require a minimum EER of 11.8 to comply with Section C406.2, IECC 2012. [Initial comment: Show that the mechanical systems for the building comply with the current energy code (e.g. provide a COMcheck Mechanical Compliance Certificate).] 3. The structural drawings indicate that the walls are constructed with wood studs, which means that hoods do not comply with the requirements of Section 507.9, IMC 2012. [Initial comment: Show that the installation of hood EH-3 (aka KH-3) complies with Section 507.9, IMC 2012 with regard to a smooth, cleanable, non-absorbent, and non-combustible material installed between the hood and a wall built with non-combustible structure and extending 18" beyond the hood. Verify that the partition wall located between hoods EH-1 and EH-2 is built with non-combustible structure (e.g. metal studs).] |
11/19/2015 | KROBLES1 | ENGINEERING | REVIEW | Needs Review | |
11/19/2015 | KROBLES1 | ZONING | REVIEW | Needs Review | |
11/19/2015 | KROBLES1 | FIRE | REVIEW | Needs Review |