Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM05770
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/19/2015 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
08/19/2015 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
08/19/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
08/19/2015 | KEN BROUILLETTE | FIRE | REVIEW | Reqs Change | 1. PLEASE CLARIFY ON PLANS WHY COVER SHEET HAS NOTES 28 AND 29 BUT ALSO STATES THAT NO FIRE ALARM SYSTEM IS INSTALLED. 2. PLEASE INDICATE THE COMMODITY CLASSIFICATION OF STORAGE, THE HEIGHT OF THE STORAGE AND IF STORED ON RACKS. IF A STORAGE PLAN IS AVAILABLE PLEASE SUBMIT. 3. IF AREA WILL BE USED FOR HIGH PILED STORAGE, THEN PLEASE SUBMIT THE FIRE SPRINKLER DESIGN CRITERIA OF THE EXISITING SYSTEM. 4. PLEASE PROVIDE A ROOF DETAIL INDICATING DRAFT CURTAINS AND SMOKE VENT LOCATIONS, PER IFC SECTION 910 |
08/19/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET IA0.0: PLEASE PROVIDE THE PLUMBING FIXTURE CALCULATIONS ON THE DRAWINGS (TOILETS, LAVATORIES, DRINKING FOUNTAIN, SERVICE SINK, ETC.). 2. GENERAL: PLEASE PROVIDE EGRESS AND EXITING ANALYSES ON A PLAN, INDICATING THE NUMBER OF EXITS REQUIRED AND PROVIDED, EXIT WIDTHS REQUIRED AND PROVIDED, TRAVEL DISTANCES, ETC. 3. GENERAL: PLEASE PROVIDE AN ACCESSIBILITY REVIEW FOR EXITING, ENTRANCES, TOILETS, ETC. 4. GENERAL: PLEASE PROVIDE A FULL CODE ANALYSIS ON THE DRAWINGS PER THE IBC SECTION 107. 5. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
08/19/2015 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
08/20/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project (i.e. HP-5). Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012. |
08/20/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Verify that the new total water demand (plumbing fixtures plus evap coolers and hose bibbs) will not result in the water velocity in the service pipe exceeding 8 feet per second. |
08/20/2015 | ROBERT SHERRY | WATER | REVIEW | Completed |