Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM05737
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/18/2015 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 08/18/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 08/18/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide a maint. receptacle on the roof for the new HP-1 unit as required per NEC. |
| 08/18/2015 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Approved | |
| 08/18/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET T1 (CODE REVIEW CHECKLIST); SHEET A3 (FLOOR PLAN): PROVIDE A CALCULATION ON THE DRAWINGS FOR THE OCCUPANT LOAD DETERMINATION FOR THIS PROJECT. 2. SHEET T1; EXIT PLAN: PLEASE INDICATE THE EXIT ACCESS TRAVEL DISTANCES ON THIS PLAN PER THE IBC SECTION 1016, AND VERIFY THESE DISTANCES MEET THE CODE REQUIREMENTS. 3. SHEET A3 (FLOOR PLAN); SHEET E1 (FLOOR PLAN): AT THE NEW OPENING IN THE WALL, EXIT SIGNAGE IS REQUIRED PER THE IBC SECTION 1011. PLEASE PROVIDE ON THE DRAWINGS. NEW SIGNAGE MUST ALSO INDICATE DIRECTION FROM THE NEW SPACE TO THE SECOND EXIT. 4. SHEET A3; FLOOR PLAN: AT THE NEW OPENING IN THE WALL, PROVIDE A HEADER SIZE AND DETAILS ON THE DRAWINGS. 5. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 08/18/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 08/18/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | If the showers do not have pre-fabricated receptors, provide details to show that the construction of the receptors complies with the requirements of Section 417.5.2, IPC 2012. |
| 08/18/2015 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 08/19/2015 | KEN BROUILLETTE | FIRE | REVIEW | Reqs Change | Same as building review comments |