Review Status: Completed
Review Details: REVISION - - 5TH
Permit Number - T15CM05730
Review Name: REVISION - - 5TH
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/26/2017 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
02/06/2017 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Removing the diffusers in the corridor did not address the problem. You are supplying air to a room (e.g. room 211) and the air then has to exit the room and travel down the corridor (i.e. using the corridor as a duct) to the return grilles located in room 208. [Initial comment: Revise the mechanical design for the RTU-4 ductwork as required to avoid using the corridor as a return air duct. Reference: Section 601.2, IMC 2012.] |
02/07/2017 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Civil drawing C4.40 was not provided. [Initial comment: Provide copies of the revised civil drawings, C3.10 and C4.40 for review.] 2. The specified overflow roof drain (JR Smith model 148-Y03) requires the addition of a dome (JR Smith model 148-10) to the overflow drain in order to comply with Section 1102.6, IPC 2012. [Initial comment: Verify that the overflow roof drain noted in keynote 22-151 complies with the requirements of to ASME A112.6.4 0r ASME A112.3.1. Reference: Section 1102.6, IPC 2012.] |
02/08/2017 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
02/10/2017 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. PREVIOUS COMMENT 3; SHEET A1.2a; PLACEMENT PLAN EAST: THERE ARE MANY FLOOR DRAINS THAT INDICATE AN ELEVATION WITH TEXT THAT IS LESS THAN 3/32" IN HEIGHT. PLEASE REVISE. 2. GENERAL: PLEASE VERIFY ON ALL SHEETS THE LETTERING MEETS THE CITY OF TUCSON REQUIREMENTS OF 3/32" MINIMUM HEIGHT FOR ALL (UPPER AND LOWER CASE). 3. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/18/2017 | KROBLES1 | OUT TO CUSTOMER | Completed |