Permit Number: T15CM05730
Parcel: 138244030

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T15CM05730
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/04/2016 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. The submitted calculations correctly indicate that eight 48-inch wide scuppers will be required for the main roof but the architect shows eight 16-inch wide scuppers draining the main roof east of column line 5 and no drainage for the main roof from column line 5 through column line 7. No drainage is shown for the pharmacy canopy. Coordinate the roof drainage with the architect. The minimum dimension for a scupper is 4" so a 0.90" scupper width is not allowed (Section 1108.3, IPC 2012). [Second comment: A scupper is a weir, not horizontal pipe and its cross-sectional area does not determine its capacity. Consult with the structural engineer to determine the maximum rainwater depth that the roof can accommodate. Reference: Sections 1611.1 and 1611.3, IBC 2012.] [Initial comment: Provide roof drainage and hydraulic scupper size calculations based on the 100-year hourly rainfall rate for Tucson, 3" per hour. Reference: Sections 1106.1, 1106.4, and 1108.3, IPC 2012.]
2. The minimum dimension for a scupper is 4" so a 0.90" scupper width is not allowed (Section 1108.3, IPC 2012). [Second comment: A scupper is a weir, not horizontal pipe and its cross-sectional area does not determine its capacity.] [Initial comment: Provide calculations to show that the overflow pipe (note 07-111, A3.1.1) for the canopy has the same capacity as the roof drain provided for the canopy. Reference: Sections 1101, 1106 and 1108, IPC 2012, and Sections 1611.1 and 1611.3, IBC 2012.]
01/04/2016 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
12/18/2015 ELIZABETH LEIBOLD ENGINEERING REVIEW Approved
12/22/2015 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
12/28/2015 MICHAEL ST. PAUL ZONING REVIEW Approved