Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T15CM05730
Parcel: 138244030

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T15CM05730
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/13/2015 KEN BROUILLETTE FIRE REVIEW Approved
10/22/2015 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. PREVIOUS COMMENT 13; SHEET A1.1a (FLOOR PLAN); SHEET A3.3 (STAIR ONE SECTION 5): PER THE IBC SECTION 1009.9.3, 'THE WALLS AND SOFFITS WITHIN ENCLOSED USABLE SPACES UNDER ENCLOSED AND UNENCLOSED STAIRWAYS SHALL BE PROTECTED BY 1-HOUR FIRE-RESISTANCE-RATED CONSTRUCTION OR THE FIRE RESISTANCE RATING OF THE STAIRWAY ENCLOSURE, WHICHEVER IS GREATER'. THIS ENCLOSED SPACE DOES NEED TO BE RATED.
2. GENERAL: PLEASE PROVIDE A WRITTEN RESPONSE TO THE REVIEW COMMENT.
10/23/2015 ROBERT SHERRY WATER REVIEW Completed
10/28/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Revise the cycle time for the automatic faucets so that they will operate for a minimum time of 10-seconds. Reference: Section 606.4, ICC/ANSI A117.1-03. [Initial comment: Provide automatic faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Reference: Section 416.6, IPC 2012, as amended by the City of Tucson.]
2. Approval in process, not yet completed. [Initial comment: Verify that the Regional Wastewater Reclamation Department for Pima County will allow water from an elevator sump to be introduced into the sanitary waste system. Reference: Section 701.5, IPC 2012; Contact the Regional Wastewater Reclamation Department, at 520-724-6200 for further information. Note: Verify that the proposed floor sink is capable of accepting a flow of 50 GPM without splashing or flooding.]
3. Comment not resolved; show the cleanout on the plumbing plans, P1.1d. [Initial comment: Provide a cleanout at the base of the waste stack from the mezzanine. Reference: Section 708.3.4, IPC 2012.]
4. Verify that the floor drains, floor sinks, trench drains, and hub drains are sized to reflect the drainage fixtures that discharge into them or, if they only accept clear water waste they are given a drainage fixture value of one-half. Reference: Sections 709.4 and 709.4.1, IPC 2012. Servicing a 4,000-gallon gravity grease interceptor would require at least two trucks. [Initial comment: Provide sizing calculations for the gravity grease interceptors. Reference: Section 1003.3, IPC 2012, as amended by the City of Tucson.]
5. A scupper is a weir, not horizontal pipe and its cross-sectional area does not determine its capacity. Consult with the structural engineer to determine the maximum rainwater depth that the roof can accommodate. Reference: Sections 1611.1 and 1611.3, IBC 2012. [Initial comment: Provide roof drainage and hydraulic scupper size calculations based on the 100-year hourly rainfall rate for Tucson, 3" per hour. Reference: Sections 1106.1, 1106.4, and 1108.3, IPC 2012.]
6. Provide a cleanout at the base of each roof drain stack serving the main roof. [Initial comment: Provide a cleanout at the base of each roof drain stack prior to connection to the horizontal storm drain. Reference: Sections 708.3.4 and 1101.8, IPC 2012.]
7. A scupper is a weir, not horizontal pipe and its cross-sectional area does not determine its capacity. [Initial comment: Provide calculations to show that the overflow pipe (note 07-111, A3.1.1) for the canopy has the same capacity as the roof drain provided for the canopy. Reference: Sections 1101, 1106 and 1108, IPC 2012, and Sections 1611.1 and 1611.3, IBC 2012.]
10/30/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Only RTU-5, RTU-8, and RTU-14 have energy efficiency ratios that meet or exceed those called for by Table C406.2 (1), IECC 2012. The remaining packaged rooftop units do not qualify as high efficiency HVAC units. [Initial comment: Show how the "Additional Efficiency Package Requirements" (C406, IECC 2012) is to be accomplished. Reference: Section C401.2, IECC 2012.]
10/30/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
11/04/2015 MICHAEL ST. PAUL ZONING REVIEW Needs Review Approval of DP15-0037 is required. The buildings must match the approved development package site plan (DP15-0037).
11/09/2015 ELIZABETH LEIBOLD ENGINEERING REVIEW Approv-Cond Bldg permit approval for Engineering review pending approval of grading permit approval/issuance and Tentative Plat approval. Keep in mind elevation certification is required for this building; see Floodplain Use Permit T15OT01092.