Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T15CM05686
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/28/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not resolved. Show the required standard for the tempering valve: ASSE 1070. [Initial comment: Provide tempered water for the restroom lavatories using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2012.] 2. Comment partially answered; each vent must rise at least 6" above the flood rim for the water closet it serves prior to running horizontally. Note the definition of "vertical pipe" (or conversely, "horizontal pipe") in Section 202, IPC 2012. It is not clear in the riser diagram if the vents comply with this requirement. [Initial comment: Verify that the vents shown for the water closets located in the restrooms for classrooms 101 and 102 rise a minimum of 6" above the flood rims for the water closets prior to running horizontal or joining another vent. Reference: Sections 905.4 and 905.5, IPC 2012.] |
| 09/28/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Comment not resolved; provide a permanent label or sign stating the total equivalent length of the concealed dryer exhaust duct. The sign shall be located within 6-feet of the exhaust duct connection. [Initial comment: Provide signage indicating the total equivalent length of the concealed dryer exhaust duct. Reference: Section 504.6.5, IMC 2012.] |