Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T15CM05620
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/16/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify the call-out for P-3 on sheet P2. Is this a typo; on sheet P1 it is an existing mop sink. 2. Coordinate the power requirements for the new WH-1 located by the service sink, P-1. Based on the electrical drawings, there is an existing WH-1 (and a WH-2) located somewhere in the building that has a 60A disconnect. Reference: Section 107.2.1, IBC 2012. 3. Provide the design for the structure over the equipment pad. Reference: Section 107.2.1, IBC 2012. 4. Provide identification of the non-potable water piping downstream of the backflow preventer on the equipment pad. Reference: Section 608.8, IPC 2012. |
12/17/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Show that the new rooftop heat pumps, chiller and cooling tower comply with the current energy code (i.e. provide the COMcheck Mechanical Compliance Certificate). 2. Verify that the new roll-up door complies with the current code (i.e. provide the COMcheck Envelope Compliance Certificate). 3. Provide ventilation for the fork truck charging areas. Reference: Section 502.3, IMC 2012. 4. Show how and where the relief piping for the chiller will be routed and terminated. Specify the size and material of the relief pipe. Reference: Section 1105.7, IMC 2012. |
12/17/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
12/29/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments, also provide a written response. #1. Provide for a GFI equipped main breaker and performance testing at the electrical service as required per, NEC art. 230.95 #2. Correct the panel schedule for panel 'M1' Circuit 7,9,11, and the electrical feeder schedule for A8 Control circuit designation, plan sheet E2.0. NEC art. 408. #3. Verify drawing index on the cover plan C1 for electrical plans is correct, are the electrical plans complete? REF : IBC sec. 107.2.1 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/05/2016 | KROBLES1 | OUT TO CUSTOMER | Completed |