Permit Number: T15CM05620
Parcel: 115160380

Address:
925 W GRANT RD

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T15CM05620
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/16/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Clarify the call-out for P-3 on sheet P2. Is this a typo; on sheet P1 it is an existing mop sink.
2. Coordinate the power requirements for the new WH-1 located by the service sink, P-1. Based on the electrical drawings, there is an existing WH-1 (and a WH-2) located somewhere in the building that has a 60A disconnect. Reference: Section 107.2.1, IBC 2012.
3. Provide the design for the structure over the equipment pad. Reference: Section 107.2.1, IBC 2012.
4. Provide identification of the non-potable water piping downstream of the backflow preventer on the equipment pad. Reference: Section 608.8, IPC 2012.
12/17/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Show that the new rooftop heat pumps, chiller and cooling tower comply with the current energy code (i.e. provide the COMcheck Mechanical Compliance Certificate).
2. Verify that the new roll-up door complies with the current code (i.e. provide the COMcheck Envelope Compliance Certificate).
3. Provide ventilation for the fork truck charging areas. Reference: Section 502.3, IMC 2012.
4. Show how and where the relief piping for the chiller will be routed and terminated. Specify the size and material of the relief pipe. Reference: Section 1105.7, IMC 2012.
12/17/2015 ROBERT SHERRY WATER REVIEW Completed
12/29/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments, also provide a written response.
#1. Provide for a GFI equipped main breaker and performance testing at the electrical service as required per, NEC art. 230.95
#2. Correct the panel schedule for panel 'M1' Circuit 7,9,11, and the electrical feeder schedule for A8 Control circuit designation, plan sheet E2.0. NEC art. 408.
#3. Verify drawing index on the cover plan C1 for electrical plans is correct, are the electrical plans complete?
REF : IBC sec. 107.2.1

Final Status

Task End Date Reviewer's Name Type of Review Description
01/05/2016 KROBLES1 OUT TO CUSTOMER Completed