Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM05347
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/17/2015 | CLAYTON TREVILLYAN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | BUILDING PLAN REVIEW COMMENTS Date: 8-19-15 Activity: T15CM05347, 5348 Address: 7250 S. Tucson Blvd. Applicant: Sandra Kukla This letter reflects comments to be addressed. The purpose of this review is to verify compliance to the 2012 International Building Code and local amendments. Plans must be of sufficient clarity to indicate the location, nature and extent of the work proposed, 102.2.1. In order to facilitate a shorter back check time, we request that you please provide two complete sets of revised plans and calculations, along with a written response to each of the noted items indicating action taken. Other comment references may be derived from additional codes and standards adopted by The City of Tucson. All features have been checked only to the extent allowed by the submittals provided for review. All portions of this project are assumed to meet other departmental requirements, conditions and concerns before permit approval. Sheet G004: 1. Please revise the code year specified for standpipe systems. The 2006 IBC is not the currently adopted regulation. Sheet A203 & A212: 2. The general note for exit sign locations directs to the electrical sheets yet no information is provided on those sheets for the location of exit signage. Please reconcile these sheets. 3. Please complete the general note for ceiling types and provide the sheet reference. If you have any questions please contact: Clayton Trevillyan, CBO 520.837.4913 Clayton.Trevillyan@tucsonaz.gov |
08/25/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please clarify the following electrical plan review comment. Plan sheet E101 and E400 show panel 'RATL' as new. The one line diagram plan sheet E500 show this panel as existing. If it is a new panel and replacing an existing panel, please indicate. Include feeder conduit, conductor sizes,types, on the plan. Please clarify. |
08/26/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
08/26/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
08/26/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed |