Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T15CM05181
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/08/2015 | AROMERO4 | ZONING | REVIEW | Needs Review | |
| 10/08/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the Packaged Air Conditioning Schedule to reflect the information on the revised COMcheck Mechanical Compliance Certificate (e.g. EER and economizer). [Initial comment: Show that the mechanical systems for the building comply with the current energy code (e.g. provide a COMcheck Mechanical Compliance Certificate). 2. Comment not resolved. Prohibiting people from walking on the roof is not an option; provide a solution to the problem. [Initial comment: Provide structural calculations and details to show that the Type I hoods are supported from the building structure in accordance with Section 507.6, IMC 2012 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2012.] |
| 10/08/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 10/08/2015 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 10/08/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 10/08/2015 | AROMERO4 | ENGINEERING | REVIEW | Needs Review | |
| 10/08/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Each compartment of the 3-compartment sink shall be separately drained to protect against cross-contamination or fouling [Initial comment: Provide indirect waste piping for the 3-compartment sink. Each compartment of the 3-compartment sink shall be separately drained to protect against cross-contamination or fouling. (The 3-compartment sink appears to be scheduled for indirect wastes but is shown directly connected in the plumbing waste plan and the waste and vent schematic. Conversely, the prep sink is scheduled to be directly wasted but is drawn with an indirect waste on the plumbing waste plan and the waste and vent schematic. Both are to be indirectly wasted.) Reference: Section 802.1 and 802.1.8, IPC 2012.] |