Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T15CM05057
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/30/2015 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
10/01/2015 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
10/14/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The water form (A) on sheet P3 still includes the term "private" for some of the fixtures; there are no private fixtures in this building. [Initial comment: There are no private fixtures in this building; the term "private" for plumbing fixtures applies to fixtures that are located in a residence or apartment, non-public toilet rooms in hotels or motels, and are intended for the use of a family or an individual. Reference: Section 202, IPC 2012.] 2. Beverage dispensers, such as coffee makers, require the use of a backflow preventer that is listed to ASSE 1022. Reference: Section 608.16.10, IPC 2012. [Initial comment: Appliances (e.g. beverage dispensers, ice makers, etc) to be directly connected to the water supply system that do not have listed, integral backflow preventers or integral air gaps conforming to Section 608.13.1, IPC require backflow prevention. Specify the type of backflow prevention device required for each water connection. Reference: Sections 608.1 and 608.3, IPC 2012.] |
10/14/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | No energy code compliance calculations have been submitted for the new doors. [Initial comment: Provide energy code compliance calculations for alterations to the building envelope (e.g. new doors); use the climate zone for Tucson. Reference: Sections C101.4.3, C103.2, and C401.2.1, International Energy Conservation Code 2012.] |
10/15/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
10/26/2015 | CLAYTON TREVILLYAN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | FINAL APPROVAL PENDING MECHANICAL AND PLUMBING COMMENTS |
10/27/2015 | CPIERCE1 | ZONING HC | REVIEW | Passed | |
11/03/2015 | CPIERCE1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed |