Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM05050
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/22/2015 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
07/22/2015 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
07/23/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | #1. Please provide full compliance with the IECC for interior lighting. #2. Please label the loadcenters correctly on the floorplans. |
07/23/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
07/23/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET CS: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. PLEASE REVISE THE BUILDING ANALYSIS/SCOPE VERBIAGE. 2. SHEET CS (BUILDING ANALYSIS); SHEET A5 (FLOOR PLAN): THE FLOOR PLAN INDICATES A HIGH/LOW DRINKING FOUNTAIN NEAR THE RESTROOM IN ADDITION TO A SINGLE POINT OF USE WATER DISPENSER, WHILE THE BUILDING ANALYSIS INDICATES ONLY A SINGLE POINT OF USE WATER DISPENSER. PLEASE CLARIFY. 3. SHEETS A1 AND A2: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. PLEASE REVISE THE SPECIFICATIONS. 4. SHEET A5; FLOOR PLAN: WHAT IS THE REQUIRED WIDTH FOR THE MEANS OF EGRESS CORRIDOR LEADING TO THE WEST EXIT? DOES DOOR 7 AT THE EXISTING RESTROOM #1 MEET THE REQUIREMENT OF THE IBC SECTION 1005.7.1 OF NOT REDUCING THE REQUIRED WIDTH BY MORE THAN ONE-HALF? PLEASE VERIFY. 5. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
07/23/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
07/23/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
07/23/2015 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
07/28/2015 | KEN BROUILLETTE | FIRE | REVIEW | Approved |