Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM05011
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/21/2015 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
08/10/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the mechanical COMcheck for "alteration", not new comnstruction. 2. Provide the envelope COMcheck, include documentation for the glazing. 3. Provide for interlocking HP-3 with EF-4. |
08/10/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | #1.Please provide a complete panel schedule for 'EMDP' #2. One line diagram shows two panels designated as 'A'. |
08/10/2015 | KEN BROUILLETTE | FIRE | REVIEW | Passed | |
08/10/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the water distribution calculations, using the stated alculation method (i.e. Section 6.5, UPC 2006) 2. Clarify the fixture tags used on the isometrics and the plumbing plans. 3. Verify the static lift used for the water pressue calculations. 4. Verify the size of the scheduled water service to the water closets. |
08/10/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
08/11/2015 | KROBLES1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
08/11/2015 | KROBLES1 | ENGINEERING | REVIEW | Needs Review | |
08/11/2015 | KROBLES1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |