| 07/10/2015 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 07/10/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide the design requirements for the quench vent. Show the location and extent of the danger zone for the vent discharge on the roof along with the required signage and barriers. Reference: Section 304.1, IMC 2012. 2. Show how the new chiller and chiller piping is to be installed. Reference: Section 107.2.1, IBC 2012. |
| 07/10/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | #1. Please provide conductor sizes for the grounding electrode system, shown as existing. Verify for the increased size of the Service Equipment. #2. Voltage shown for the service equipment seems to be in conflic with the panel voltage for '480RAD'. And existing panels. #3. Please provide a complete fault current analysis. #4. Show complete compliance with the IECC for the interior lighting. |
| 07/10/2015 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 07/10/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET A1.00; APPLICABLE CODES: PLEASE REVISE THE ACCESSIBILITY CODE TO THE 2009 ICC/ANSI A117.1. 2. SHEET A1.00; CODE PLAN: SINCE TWO EXITS ARE REQUIRED, THE TWO DOORS INDICATED ON THE WEST WALL ARE NOT SEPARATED AS REQUIRED PER THE IBC SECTION 1015.2.1. PLEASE REVISE. 3. SHEET A1.00; CODE PLAN: PLEASE VERIFY THERE ARE NO DEAD END CORRIDORS THAT EXCEED THE LIMITS OF THE IBC SECTION 1018.4. 4. GENERAL: PLEASE VERIFY ON THE DRAWINGS THE USE AND STORAGE OF HAZARDOUS MATERIALS IN THIS TENANT SPACE. PLEASE ADD A TABLE TO THE DRAWINGS IN THE FORMAT OF TABLES 307.1(1) AND 307.1(2). PROVIDE STORAGE, SEPARATION, AND USE OF THE HAZARDOUS MATERIALS AS REQUIRED PER THE IBC SECTION 307. 5. SHEET S2.0; FRAMING PLAN: PLEASE PROVIDE STRUCTURAL CALCULATIONS FOR THE EXISTING BEAMS SUPPORTING NEW MECHANICAL LOADS. VERIFY THE EXISTING STRUCTURE CAN SUPPORT THE NEW LOADS. 6. SHEET S2.0; FRAMING PLAN: PLEASE PROVIDE STRUCTURAL CALCULATIONS FOR THE EXISTING BEAMS SUPPORTING NEW X-RAY LOADS. VERIFY THE EXISTING STRUCTURE CAN SUPPORT THE NEW LOADS. 7. GENERAL: PLEASE PROVIDE ON THE DRAWINGS MATERIAL PROPERTIES FOR THE CONCRETE, STRUCTURAL STEEL, WOOD, CONCRETE REINFORCING, BOLTS, WELDS, ETC. 8. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 07/10/2015 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide the size and serial number of the water meter that serves the demand identified on sheet P0.1. |
| 07/10/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 07/10/2015 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 07/13/2015 | KEN BROUILLETTE | FIRE | REVIEW | Approved |