Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Number: T15CM04515
Parcel: 117083710

Address:
102 W 20TH ST

Review Status: Completed

Review Details: RESIDENTIAL - BLDG/ZONING-WALKTHRU

Permit Number - T15CM04515
Review Name: RESIDENTIAL - BLDG/ZONING-WALKTHRU
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/02/2015 DAVID RIVERA ZONING REVIEW Denied FROM: David Rivera, Principal Planner

TRANSMITTAL: January 7, 2013
ACTIVITY NUMBER:
ADDRESS:
PROJECT:

DDO Required for West Perimeter yard and Street perimeter yard setbacks.

TRANSMITTAL: July 2, 2015


COMMENTS: the following comments are relative to an application for a Design Development Option (DDO) (UDC 3.11.1).


This site is located in the R-3 zone (UDC 4.7.12). Single-family residential is a permitted use in this zone (Table 4.8-4). See Use Specific Standards 4.9.7.B.6.

The minimum setback is the greater of six (6) feet, or two-thirds (2/3) the height of the structure's wall facing each interior property line (Table 6.3-2.A).

01. COMMENT: Owner proposes to construct a new dwelling. The west perimeter building setback is proposed at 6 feet from the property line to the building wall. Based on the overall height of 9'-6" the required building setback must be 6'-4", the owner proposes 6'-0".

The minimum setback to the front street perimeter property line is the greater of twenty (20) feet, or one and one-half (1 ½) the height of the proposed wall (UDC 6.4.5.C.1.a).

02. COMMENT: Owner proposes to construct a new dwelling. The front street setback must be a minimum of 20 feet from the porch columns; the owner proposes 6'-0".

The main house front wall must be setback a minimum of 20 feet from the front front property; the owner proposes 14'-0"
07/02/2015 DAVID RIVERA NPPO REVIEW Passed
11/10/2015 KROBLES1 WWM REVIEW Completed
11/10/2015 KROBLES1 ENGINEERING REVIEW Needs Review
11/10/2015 KROBLES1 BUILDING-RESIDENTIAL REVIEW Needs Review