Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T15CM04368
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/21/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
09/02/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | The specified condensate drain box, CDB-1, is located behind an access panel. By definition, ready access means that the fixture, appliance, or equipment having ready access must not require the "...removal or movement of any panel, door or similar obstruction..." to obtain access. [Initial comment: The condensate drain boxes are indirect waste receptors. Indirect waste receptors shall have ready access. Reference: Section 802.3, IPC 2012.] |
09/02/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
09/03/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed. [Initial comment: Provide energy code compliance calculations for the additions to the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012.] 2. Comment not addressed. [Initial comment: Provide NFRC fenestration product ratings for the U-factor and the SHGC values on COMcheck or use the appropriate default U-factor and SHGC values from Tables C303.1.3 (1), C303.1.3 (2) and C303.1.3.(3), IECC 2012. Factory-manufactured windows are required to have certificates attesting to their compliance to NFRC Standards 100 and 200 and can be provided by the manufacturer or found at www.nfrc.org. For site assembled commercial products, the NFRC component modeling approach program enables commercial window manufacturers to produce bid reports to prove energy performance prior to being awarded a job and provide finalized label certificates once the product has been installed. Fenestration performance reports based on AAMA 507 are based on energy simulations only (no actual testing) and are not acceptable. Reference: Section C303.1.3, IECC 2012.] |
09/08/2015 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: TMC Labor & Delivery T15CM4368 Building Plan (2nd Review) TRANSMITTAL DATE: September 8, 2015 1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. It appears that the plans match development package DP15-0023 but Zoning will not approve until all other PDSD agencies have approved the building plan. 3. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |