Permit Number: T15CM04298
Parcel: 124052120

Address:
903 E 7TH ST #01

Review Status: Completed

Review Details: REVISION - - 2ND

Permit Number - T15CM04298
Review Name: REVISION - - 2ND
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/10/2016 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Principle Planner

PROJECT: T15CM04298
903 E. 7th Street
Residential (1st Review)

TRANSMITTAL DATE: June 10, 2016

The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

1. Provide a lot coverage calculation on the plan that meets the requirements of UDC Article 6.4.3. Maximum lot coverage allowed is 70% see UDC TABLE 6.3-2.A: DIMENSIONAL STANDARDS FOR THE R-1, R-2, R-3, MH-1, & MH-2 ZONES.

2. The access shown to the accessible vehicle parking space does not meet the minimum width of 24', see UDC Table 7.4.6-1.

3. It's not clear how vehicles will be prevented from access the sidewalk shown along the east and south side of the parking area, see UDC Article 7.4.6.H.

4. Remove all references to "MULTI-FAMILY DEVELOPMENT" as this site is not considered multi-family, see UDC Article 11.3.7.3.

5. Revise "SITE NOTES AND ZONING AND LAND USE NOTES" #4 to show the correct lot size. Based on UDC Table 6.3-2.A the minimum lot size for two (2) units in the R-2 zone 5,808 square feet.

6. The accessible vehicle parking space is not required.

7. The short term bicycle parking shown is not required.

Once the above comment is addressed Zoning is willing to provide an over-the-counter review. Call or email to schedule this appointment.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
06/14/2016 RBENT1 LANDSCAPE REVIEW Needs Review
06/14/2016 RBENT1 ENGINEERING REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
06/14/2016 RBENT1 OUT TO CUSTOMER Completed