Permit Number: T15CM04115
Parcel: 11451682A

Review Status: Completed

Review Details: PLANS OK TO SUBMIT - RES

Permit Number - T15CM04115
Review Name: PLANS OK TO SUBMIT - RES
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/22/2015 JASON GREEN ENGINEERING REVIEW Reqs Change DATE: June 22, 2015
SUBJECT: Photovoltaic System
TO: SolarCity Corporation
REVIEWERS: Jason Green, CFM


SUMMARY: Engineering Division of Planning & Development Services Department has received and reviewed the Site Plan for the installation of a photovoltaic system and does not recommend approval of the Site Plan at this time.

1) Revise the site plan to accurately show the structure within the property dimensions.
2) Revise the site plan to provide the lot dimensions at a minimum of 3/32 inch or 12 point font size.



If you have any questions, I can be reached at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
Planning & Development Services
06/24/2015 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: T15CM04115
2620 N. Woodland Road
Residential (1st Review)

TRANSMITTAL DATE: June 24, 2015

The solar plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

1. House orientation on the parcel is not correct.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
06/26/2015 KEN VAN KARSEN BUILDING-RESIDENTIAL REVIEW Reqs Change T15CM04115

PLAN REVIEW COMMENTS
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, we request that you please provide revised plans and calculations, highlighting any changes, along with a written response to each of the noted items indicating action taken.

SCOPE OF REVIEW:
The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2012 International Residential Code, 2012 International Fire Code, 2011 National Electrical Code and Arizona Revised Statutes. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

GENERAL REQUIREMENTS:
All corrections and revisions shall be made on original tracings or a finished reproducible set. Return two sets along with a set of the first submission for reference. Pen or pencil corrections on final prints will not be acceptable. To avoid delays, ensure that all corrections have been made, are complete, and have been coordinated on all applicable detail and note sheets. (Do not cloud the changes made for comment revisions). Incorporate changes on originals and provide two copied sets for review.
DIAGRAMS / CALCULATIONS
1. Show the sum of the main and backfed breakers not exceeding 120% of the busbar rating, NEC 690.64 & 705.12 (D). This applies to both the service panel bus (non-compliant) and the distribution panel bus (compliant). The main service bus currently protected with a 200 AMP utility breaker and a 60 AMP inverter breaker passing through the 80 AMP breaker which serves as the distribution panel main. Provide an electrical load calculation if reducing the service panel main breaker rating.
2. Show the sum of the main and backfed breakers not exceeding 120% of the bus conductor rating, NEC 690.64 & 705.12 (D). This applies to the distribution panel conductor between main breaker and bus (wire 10 on plan). Identify wire size and upsize if needed.

If you have any questions please contact:
Ken Van Karsen
(520) 837-4912
City of Tucson Residential Plan Review