Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM03202
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/13/2015 | DAVID RIVERA | ZONING | REVIEW | Approved | |
05/13/2015 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
05/13/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET D-1: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. PLEASE REVISE THE NOTES AND VERBIAGE ON THE DEMOLITION PLAN. 2. SHEET D-1; KEY NOTE 10: PLEASE PROVIDE A NOTE ON THE DRAWINGS INDICATING HOW THE MAXIMUM 20% OF THE PROJECT COST WAS USED TO IMPROVE AN AREA OF PRIMARY FUNCTION (ACCESSIBILITY TO THE BUILDING, GRAB BARS IN THE RESTROOM, ETC.) PER THE IBC SECTION 3411.7. 3. SHEET A-1: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. PLEASE REVISE THE NOTES AND VERBIAGE ON THE FLOOR PLAN AND CEILING PLAN. 4. SHEET A-1; FLOOR PLAN: NEW RACKS MUST BE SUBMITTED AS A DEFERRED SUBMITTAL TO THIS PROJECT. RACKS UP TO 6' TALL NEED NO FURTHER REQUIREMENTS. RACKS OVER 6' TALL UP TO 12" TALL REQUIRE A DETAIL ON THE DRAWINGS FOR THE CONNECTION TO THE FLOOR SLAB. RACKS OVER 12' TALL REQUIRE STRUCTURAL CALCULATIONS AND A DETAIL ON THE DRAWINGS FOR THE CONNECTION TO THE FLOOR SLAB. 5. SHEETS D-1 AND A-1: PROVIDE A NORTH ARROW ON THE PLANS. 6. SHEET A-1; FLOOR PLAN: IS THE SERVICE ROOM 101 ACCESSIBLE TO THE PUBLIC? CAN DOORS 2 AND 4 BE LOCKED? PLEASE VERIFY. 7. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
05/13/2015 | MARTIN BROWN | FIRE | REVIEW | Approved | |
05/13/2015 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
05/14/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
05/14/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
05/14/2015 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide the size of the water meter serving this suite and the total water demand for that meter. |
05/14/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Denied pending resolution of the building comments. |
06/04/2015 | AROMERO4 | WWM | REVIEW | Completed |