Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T15CM03131
Parcel: 141364190

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T15CM03131
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/21/2015 MARTIN BROWN FIRE REVIEW Approved
05/28/2015 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: La Estancia De Tucson - Pool House
T15CM03131
Building Plan (1st Review)

TRANSMITTAL DATE: May 28, 2015

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. It appears that the plans match development package DP14-0126 but cannot be approved until the development package/tentative plat, has been approved.

3. Zoning will not approve until all other PDSD agencies have approved the building plan.

4. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
05/29/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change #1.Please provide for a concrete encased grounding electrode for service equipment as required per NEC art. 250.50.
#2.The rated color temperature of light sources (exterior) not to exeed 3500K per sec.402.1, Tucson Outdoor Lighting Code.
06/04/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Clarify the size of the backflow preventer to be installed; 1-1/2" per keynote 1 or 3" per the water pressure calculations. Reference: Section 107.2.1, IBC 2012.
2. Clarify the size of the cold water supply to the water closet. DetailB/P1 (mislabeled) calls for a 1-1/4" supply but the plumbing schedule calls for a 1-1/2" cold water supply. Reference: Section 107.2.1, IBC 2012.
3. Provide details showing how the floor of the outside shower is to be constructed in accordance with the requirements of 417.5.2, IPC 2012.
06/04/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012.
2. Provide NFRC fenestration product ratings for the U-factor and the SHGC values on COMcheck or use the appropriate default U-factor and SHGC values from Tables C303.1.3 (1), C303.1.3 (2) and C303.1.3.(3), IECC 2012. Reference: Section C303.1.3, IECC 2012.
3. Show the location of the condensing unit, CU-1; it is not shown on the architectural plans.
4. Show how the refrigerant circuit access ports of the condensing unit are to be secured to prevent unauthorized access. Reference: Section 1101.10, IMC 2012.
06/04/2015 ROBERT SHERRY WATER REVIEW Reqs Change Correct the fixture units shown for the two flush-valve water closets in the Plumbing Schedule. Determine the total demand for the water meter using Table E103.3 (3), IPC 2012, for systems that are predominately for flushometer valves and provide the appropriately-sized water meter.
06/15/2015 ELIZABETH LEIBOLD ENGINEERING REVIEW Reqs Change La Estancia Pool House plans will be stamped for Engr approval after other Reviewers have approved plans, and, PIA plans have been issued, or, grading permit for this phase that includes Common Area A: Park/ Open Space of La Estancia De Tucson, Lots 331-410, S05-098, has been issued. (No grading permits appear to be submitted, however PIA plans appear to be in review or out for corrections.)
06/17/2015 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET CS; CODE ANALYSIS: THE RAMADA, COVERED ENTRY, POOL HOUSE, AND COVERED EQUIPMENT STRUCTURES CAN ALL BE CLASSIFIED AS A UTILITY AND MISCELLANEOUS USE GROUP (U). THE OCCUPANCY LOAD FOR THIS PROJECT COULD BE ADJUSTED AS REQUIRED.
2. SHEET CS; CODE ANALYSIS: THE PLUMBING FIXTURE CALCULATIONS REFLECT ONLY THOSE FIXTURES REQUIRED FOR THE OCCUPANCY LOAD ASSOCIATED WITH THIS PROJECT. IF NO EXISTING RESTROOM FACILITIES ARE PRESENT IN THIS AREA, THE NEW FACILITIES MUST MEET THE REQUIREMENTS FOR THE OCCUPANCY LOAD FROM THE EXISTING SWIMMING POOL AND DECK AREAS (USING TABLE 1004.1.2 FOR POOL AND DECK), AND TABLE 2902.1 (A-4 OCCUPANCY). PLEASE VERIFY.
3. SHEETS A1 AND A2; FLOOR PLANS: PLEASE PROVIDE A NORTH ARROW ON THE PLANS.
4. SHEET A1; FLOOR PLAN: THE FOUR BUILDING SECTIONS INDICATED ON THE PLAN (A, B, C, AND D) REFERENCE SHEET S4. PLEASE REVISE TO A4.
5. GENERAL: PLEASE PROVIDE AN EXITING ANALYSIS AND AN EXITING DIAGRAM FOR THE POOL, DECK, AND NEW FACILITIES ON THE DRAWINGS (NUMBER OF EXITS AND EXIT WIDTH REQUIRED).
6. GENERAL: PLEASE PROVIDE THE ENTRY GATE(S) HARDWARE AS REQUIRED BY THE IBC SECTION 1008.
7. SHEET A4; DETAILS: PLEASE PROVIDE ACCESSIBILITY DETAILS ON THE DRAWINGS FOR THE SHOWER COMPARTMENT AS REQUIRED BY THE ICC/ANSI SECTION 608 (SIZE, CLEARANCES, SEAT, GRAB BARS, SHOWER CONTROLS, ETC.).
8. SHEET S3 (GENERAL FOUNDATION NOTES); GEOTECHNICAL EVALUATION (PAGE 6): THE GEOTECHNICAL REPORT INDICATES AN ALLOWABLE SOIL BEARING PRESSURE OF 1000 PSF FOR FOOTINGS LOCATED ONE FOOT BELOW FINISH GRADE. SHEET S3 (FOUNDATION NOTE 1) INDICATES A 1500 PSF ALLOWABLE BEARING PRESSURE WAS USED IN THE FOUNDATION DESIGN, BUT DETAILS ON SHEET S5 INDICATE THE FOOTINGS ARE 12" MINIMUM BELOW FINISH GRADE. PLEASE CLARIFY.
9. STRUCTURAL CALCULATIONS: PLEASE PROVIDE A KEY PLAN FOR THE ROOF FRAMING PLAN AND THE FOUNDATION PLAN.
10. STRUCTURAL CALCULATIONS: A BEAM DESIGNATED AS A 'TRUSS BEAM 24' LONG IS DESIGNATED AS A 10X12. WHERE IS THIS BEAM LOCATED ON THE PLAN?
11. STRUCTURAL CALCULATIONS (REVISED): A REVISION INDICATES ALL TRUSS MEMBERS CAN BE REVISED FROM 6X8 (DF #2 OR BETTER) TO 4X8 (DF #2 OR BETTER). PLEASE VERIFY.
12. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
06/19/2015 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
07/28/2015 AROMERO4 OUT TO CUSTOMER Completed