Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM03060
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/12/2015 | KEN BROUILLETTE | FIRE | REVIEW | Approv-Cond | 1. THE FUTURE USE OF THE BUILDING WILL REQUIRE FIRE SPRINKLERS AND FIRE ALARM SYSTEMS |
05/18/2015 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
05/21/2015 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | P&DS TRANSMITTAL FROM: Steve Shields, Lead Planner PROJECT: T15CM03060 Illegal Pete's Window replacement TRANSMITTAL: May 6, 2015 COMMENTS: the following comments are relative to an application for Historic Review and Design Development Option (DDO) (UDC 3.11.1). This site is located in the HC-1 zone (UDC 4.7.20). A retail use is permitted in this zone (Table 4.8-4) Subject to Use Specific Standard 4.9.9.B.3 and 4.9.13.O Historic review is required for exterior window replacement. |
05/22/2015 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | SHEET S2.2 1. Please provide structural calculations for beams B1, B4, B6 and B7. 2. Please provide structural calculations for column C2. 4. In calcs, (PPG 9) need to show beams B6, B7 and B8 on key plan. 5. In calcs, (PPG 18) need to show beam B7. on key plan. 6. Please show calculations of existing joists that require 2-2x8 addition as per notes 25 and 42 and 1-2x8 as per note 26. SHEET S2.2 7. Please provide calculations that show analysis of the existing joists that require 2-2x8 addition at the roof plan. 8. Also, show notes 41 and 42 on the plan. END OF REVIEW |
05/28/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Verify that this building is subject to the requirements of the 2012 IECC. Reference: Section C101.4.2, IECC 2012. 2. If the building is to comply with the prescriptive requirements of the 2012 IECC, clarify how the mass walls are to have continuous insulation (R-5.7ci) added to the mass walls. Reference: Table C402.2, IECC 2012. 3. If the operable glazed fenestration for the building is to comply with the prescriptive requirements of the 2012 IECC, show how the replacement windows will be built to have a maximum U-factor of 0.65 BTU/h*ft2*ºF (e.g. double pane glass). Reference: Section C303.1.3, IECC 2012. |
05/28/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Passed | NO Electrical |
05/28/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
05/28/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed |