Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T15CM02553
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/08/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
06/08/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | This comment has not been resolved. The Envelope Compliance Certificate still calls for "Efficient HVAC Performance" (C406.2, IECC 2012) but both the Electrical Compliance Certificate and the Mechanical Compliance Certificate call for "Reduced Interior Lighting power". [Initial comment: The Envelope Compliance Certificate indicates that the "Additional Efficiency Package Requirements" noted in COMcheck is to consist of "Efficient HVAC Performance" (C406.2, IECC 2012). Coordinate the Mechanical Compliance Certificate with the Envelope Compliance Certificate. Reference: Section C401.2, IECC 2012.] |
06/09/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | As per last plan review comment, please provide for a special inspection for exterior lighting as required per sec. 106.2.1 of the Tucson Outdoor Lighting Code. |
06/18/2015 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Shops "F" Tucson Market Place T15CM02553 Building Plan (2nd Review) TRANSMITTAL DATE: June 18, 2015 1. The Foundation and Parking plan have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. It appears that the plans match development package DP15-0039 but cannot be approved until the development package is approved. 3. Zoning will not approve until all other PDSD agencies have approved the building plan. 4. The development package sheets that are included in the building plans are not the signed approved sheets. Either remove the not approved development package sheets, show them as reference only or provide the signed approved sheets in the plan. 5. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
06/25/2015 | CLAYTON TREVILLYAN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheets A6.0-A6.4 indicate rigid R30 insulation applied to the top of the roof framing assembly. Note #9 indicates the roof covering is below this insulation. Please clarify the location of the roof covering and include the insulation on the details found on sheet A7.1, 107.2.1 2. Please specify the thickness of rigid insulation applied to the roof and indicate how the attachment of the roof covering membrane will be secured to the roof framing assembly, 1503.1. If an additional layer of sheathing will be applied above the insulation it must be included on the drawings, 107.2.1. If you have any questions please contact: Clayton Trevillyan, CBO 520.837.4913 Clayton.Trevillyan@tucsonaz.gov |
07/02/2015 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approved |