Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T15CM02553
Parcel: 99999999A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T15CM02553
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/23/2015 KEN BROUILLETTE FIRE REVIEW Approved
04/27/2015 AROMERO4 WWM REVIEW Completed
05/05/2015 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Shops "F" Tucson Market Place
T15CM02553
Building Plan (1st Review)

TRANSMITTAL DATE: May 5, 2015

1. The Foundation and Parking plan have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. It appears that the plans match development package DP15-0039 but cannot be approved until the development package is approved.

3. Zoning will not approve until all other PDSD agencies have approved the building plan.

4. Until the above comments have been addressed and all other PDSD review agencies have approved the building plans zoning cannot approve.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
05/06/2015 RONALD BROWN BUILDING-COMMERCIAL REVIEW Reqs Change SHEET T1.0
1. Provide a list of all the City of Tucson's adopted building codes.
2. The Sheet Index for MPE sheets is not correct. Please reconcile.
SHEET A1.0
3. Detectable warnings strips are required at transportation
platforms only and may be omitted for this project. Reference note 5.
4. At note 2 provide accessible route slopes to comply with ICC A117.1, Section 403.3; 5% maximum running slopes and 2% maximum cross slopes.
SHEET A3.0
5. Provide roof crickets to slope drainage to roof drains.
SHEET S1.1
6. The north side footing is called out as CF1 Typical. There is no CF1 on the footing schedule. Maybe CF1.5?
END OF REVIEW
05/07/2015 RONALD BROWN COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
05/07/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Verify the size of the building sewer; on sheet U-1 it is identified as 6" on the drawing and 4" in the notes. Reference: Section 107.2.1, IBC 2012.
2. The layout of the grease waste piping allows for the possibility of multiple users for the proposed gravity grease interceptor. Identify the party who will be responsible for the maintenance of the interceptor (e.g. the building owner). Reference: Section 302 1, IPC 2012.
3. Provide an approved vacuum relief valve for the scheduled bottom-fed water heater which is located above the fixture outlets. Reference: Section 504.2, IPC 2012.
4. If the specified water heater is not supplied with integral heat traps, provide heat traps on the supply and discharge piping. Reference: Section C404.4, IECC 2012.
5. If the specified water heater is not supplied with integral heat traps, provide 0.5" of insulation with a maximum conductivity of 0.27 BTU per inch/h F on the first 8 feet of supply and discharge piping. Reference: Section C404.5, IECC 2012.
6. An approved 2-way cleanout fitting is a single fitting, not a field-assembled group of individual fittings as shown in detail 6/P2.0. Reference: Sections 708.3.5 and 708.5, IPC 2012.
7. Provide sizing calculations for the proposed gravity grease interceptor. The minimum acceptable size for a gravity grease interceptor is 300 gallons. Reference: Section 1003.3, IPC 2012, as amended by the City of Tucson.
8. Sheet A3.0 shows two roof drains and two overflow drains on the roof, indicates that the leaders are 4", and references the plumbing drawings for further information (see also details 5 and 6/A7.1). The background on sheet P1.0 shows the drains and leaders but no other information is shown. Provide the slope and size of the horizontal extension of the roof drain leaders, specify the terminations of the primary and overflow drains, and if the primary leader is to be connected to a storm drainage system, provide a cleanout at the base of the leader. Reference: Section 107.2.1, IBC 2012 and Sections 708.3.4, 1101.8, 1106, and 1108, IPC 2012.
05/07/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. The Envelope Compliance Certificate indicates that the "Additional Efficiency Package Requirements" noted in COMcheck is to consist of "Efficient HVAC Performance" (C406.2, IECC 2012). Coordinate the Mechanical Compliance Certificate with the Envelope Compliance Certificate. Reference: Section C401.2, IECC 2012.
2. Show that the controls for the proposed HVAC systems meet the control requirements of Section C403.2.4: set-point overlap restriction, automatic set-back and shut-down controls, automatic start capabilities, and shutoff damper controls. Reference: Section C303.1, International Energy Conservation Code 2012.
3. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012.
05/07/2015 ROBERT SHERRY WATER REVIEW Completed
05/11/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please show full compliance with the Tucson Outdoor Lighting Code.
05/20/2015 ELIZABETH LEIBOLD ENGINEERING REVIEW Reqs Change DP15-0039 needs approval before this activity can be approved.