Permit Number: T15CM02127
Parcel: 14111365A

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T15CM02127
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/08/2015 KEN BROUILLETTE FIRE REVIEW Approved
04/17/2015 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET C0; CODE ANALYSIS DATA: PLEASE INDICATE ON THE ACCESSIBILITY CODE (UNDER 'LOCAL AMENDMENTS') THE 2009 EDITION OF THE ANSI A117.1.
2. SHEET C0 (GENERAL BUILDING SUMMARY); SHEET A1 (SQUARE FOOTAGE CALCULATION): SHEET C0 INDICATES THE BUILDING SQUARE FOOTAGE IS 427 SF, WHILE SHEET A1 INDICATES 400 SF. PLEASE VERIFY.
3. SHEET A1; FLOOR PLAN: PLEASE VERIFY IF THE DUST CREATED BY THE NEW MACHINE IS COMBUSTIBLE. IF SO, PROVIDE AN ANALYSIS ON THE DRAWINGS INDICATING WHETHER THE MAXIMUM ALLOWABLE QUANTITY FOR DUST IS EXCEEDED PER THE IBC TABLE 307.1(1), THUS CREATING A HAZARD GROUP H-2. VERIFY PER TABLE 307.1(1) IF THE DUST IS IN A CLOSED SYSTEM. PROVIDE A REPORT TO THE BUILDING OFFICIAL THAT MEETS THE REQUIREMENTS OF SECTION 414.1.3 AS REQUIRED.
4. SHEET A2 (FOOTING SCHEDULE); SHEET D1 (DETAILS 4 AND 5): PLEASE INDICATE ON THE DETAILS THE TOP REINFORCING BARS AS NOTED IN THE FOOTING SCHEDULE.
5. SHEET A2 (FOUNDATION PLAN); SHEET D1 (DETAIL 16): ON THE FOUNDATION PLAN, PLEASE ADD A REFERENCE NOTE AT ONE OF THE BOLLARDS TO SEE DETAIL 16/D1.
6. SHEET A5; EXISTING FRAMING PLAN: THE SECTION CUT AT THE SOUTH END INDICATES A/A1. PLEASE REVISE THAT TO A/A5.
7. SHEET A5; SOUTH-NORTH ELEVATION: SHOULD THIS BE TITLED 'EAST-WEST ELEVATION'? PLEASE VERIFY.
8. SHEET A5; EAST AND WEST ELEVATIONS: BOTH ELEVATIONS INDICATE A COLUMN, ALTHOUGH THE PLAN SHOWS A COLUMN ON THE EAST SIDE ONLY. PLEASE VERIFY AND REVISE TITLES AS REQUIRED.
9. SHEET A5; WEST ELEVATION: THE ELEVATION INDICATES KNEE BRACES ON THE WEST ELEVATION. SHOULD THIS BE THE EAST ELEVATION? PLEASE VERIFY.
10. SHEET D1; DETAILS 4 AND 5: INDICATE ON THE DETAILS THE DEPTH OF THE BOTTOM OF THE FOOTING BELOW FINISHED GRADE. THE STRUCTURAL CALCULATIONS INDICATE 1'-6".
11. SHEET D1; DETAIL 1: PLEASE INDICATE THE TOP FLANGE OF THE STEEL BEAM.
12. SHEET D1; DETAIL 10: THE TOP NOTE INDICATES TO 'SEE STEPPED FOOTING DETAIL'. PLEASE PROVIDE THAT DETAIL ON THE DRAWINGS.
13. SHEET D2; GENERAL STRUCTURAL NOTES: PLEASE ADD SPECIAL INSPECTIONS FOR SITE PREPARATION PER THE IBC SECTION 1705.6, AND REINFORCING STEEL IN CONCRETE PER TABLE 1705.3(1). PROVIDE A CITY OF TUCSON SPECIAL INSPECTION CERTIFICATE (INCLUDED) FOR APPROVAL OF CERTIFIED INSPECTORS.
14. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
04/21/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide sizing information for the proposed scuppers. The minimum dimension for a scupper is 4". Reference: Section 1108.3, IPC 2012.
2. Provide secondary (overflow) roof drainage. Reference: Sections 1101, 1106 and 1108, IPC 2012, and Sections 1611.1 and 1611.3, IBC 2012.
04/21/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Sheet A1 indicates that a dust collection system is to be added to the structure in the future. Verify that the discharge of the dust collection system is located a minimum distance of 30-feet from the nearest property line. Reference: Section 501.3.1, IMC 2012.
04/21/2015 ROBERT SHERRY WATER REVIEW Completed
04/23/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change #1. Please provide additional electrical specifications for the "Python X" Machine, such as Phase, Voltage, Amperage, HP, KVA or KW, how the power connections or wiring terminations are made.
#2. Will there be combustible or hazardous materials used or produced that may require wiring methods per 500 articles in the NEC?
REF: IBC sec.107.2.1, NEC art. 110.3, 300.

Final Status

Task End Date Reviewer's Name Type of Review Description
04/27/2015 AROMERO4 OUT TO CUSTOMER Completed