Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM02126
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/16/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET G0.0; APPLICABLE BUILDING CODES: COMPLETE THE ACCESSIBILITY CODE WITH THE 2009 ICC/ANSI A117.1 AND INDICATE 'YES' ON THE AMENDMENTS FOR ALL OF THE CODES LISTED. 2. SHEET G0.1; CODE SUMMARY: THE OCCUPANT LOAD LISTS THE BREAKROOMS SEPARATE FROM THE REMAINING OFFICE SPACE. THESE AREAS MAY BE COMBINED, AND THE OCCUPANT LOAD DETERMINED ON A 100 SF/OCCUPANT BASIS. REVISE THE PLUMBING FIXTURE REQUIREMENTS AS REQUIRED. 3. SHEET G0.1; FLOOR PLANS 01 AND 02: MEASURE THE EXIT ACCESS TRAVEL DISTANCE PER SECTION 1016.3, USING HORIZONTAL AND VERTICAL EGRESS TRAVEL PATHS. PLEASE REVISE THE DRAWINGS. 4. SHEET G0.1; FLOOR PLAN 02: THE TRAVEL DISTANCE AT THE SOUTH DOOR INDICATES 46'-3". THE DISTANCE FROM THIS POINT TO AN ACTUAL EXIT MUST BE ADDED IN ORDER TO GET THE EXIT ACCESS TRAVEL DISTANCE. PLEASE PROVIDE ON THE PLAN. 5. SHEET D1.0; DEMOLITION PLAN: KEYNOTE 8 REFERENCES SHEET A2.3 FOR ADDITIONAL INFORMATION ON THE REMOVED WALL. IS THIS THE CORRECT REFERENCE? PLEASE VERIFY. 6. SHEET A2.0; FLOOR PLAN: KEYNOTE 16 IS INDICATED IN AN EXTERIOR DOOR AT OFFICE 113. PLEASE REVISE THAT NOTE. 7. SHEET A2.0; FLOOR PLAN: KEYNOTE 17 IS INDICATED IN AN EXTERIOR DOOR ON THE SOUTH BUILDING WALL. PLEASE REVISE THAT NOTE. 8. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
04/21/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
04/21/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify the installation of the water heater HWH-1; plumbing note 2 on sheet P1 indicates that the new water heater will be replacing an existing water heater on an existing platform but detail 3/P2 shows construction details for a new water heater platform. If the platform is new, provide structural details showing how it is to be connected to the building structure. Verify that a switched luminaire and an electrical receptacle are available for maintenance operations per Section 306.4.1, IMC 2012. Reference: Section 107.2.1, IBC 2012 and Section 301.2, IPC 2012. 2. Tempered water for the lavatories using approved devices conforming to ASSE 1070 is required. Reference: Sections 416.5 and 607.1, IPC 2012 and Section C404.3, IECC 2012. |
04/21/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
04/21/2015 | DAVID RIVERA | ZONING | REVIEW | Approved | |
04/23/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Ref: Plan Sheet E3.0 #1. Please indicate where panels C, HB, and tranformer are relocated from. #2. Provide a one diagram for this arrangment and indicate conduit, feeder, conductor,disconnect, sizes, types. Include grounding for all equipment. Load calc's. IBC sec.107.2.1, NEC art. 110.3, 408.4 |
05/13/2015 | KEN BROUILLETTE | FIRE | REVIEW | Completed | Please include a storage layout, including height and method of storage in warehouse. Please include information on existing sprinkler sytstem, including hazard classification and density of sprinkler demand. This information should be found on a placard at the riser. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/30/2015 | KROBLES1 | OUT TO CUSTOMER | Completed |