Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T15CM02104
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/22/2015 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Please list all hazardous materials being used at this facility, their quantities, how they are being stored, where they are being used and how they are being transported as outlined in the 2012 IBC, Section 307 and as outlined in Tables 307.1 (1) and 307.1 (2). END OF REVIEW |
| 05/22/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 05/22/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide overflow protection for the roof. The scupper (i.e. the hole in the parapet wall) is the primary roof drain; the overflow roof drain is to drain the roof when the primary roof drain is blocked. [Initial comment: Provide roof drainage and hydraulic scupper size calculations based on the 100-year hourly rainfall rate for Tucson, 3" per hour. Provide overflow protection for the roof. Reference: Sections 1101, 1106 and 1108, IPC 2012, and Sections 1611.1 and 1611.3, IBC 2012.] |
| 05/26/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 05/27/2015 | CPIERCE1 | ZONING | REVIEW | Needs Review | |
| 05/27/2015 | CPIERCE1 | ENGINEERING | REVIEW | Needs Review |