Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T15CM01878
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/25/2016 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 01/25/2016 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 01/25/2016 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed. [Second comment: Revise the minimum size of the fonts used on the drawings to 3/32-inches.] [Initial comment: Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2012.] 2. Comment not addressed. [Second comment: Provide the manufacturer's listing information that indicates that a reduced pressure principle backflow preventer has a pressure drop of only 9 PSI.] [Initial comment: Revise the water pressure calculations to include the pressure drop due to the reduced pressure backflow preventer. Reference: Section 604.1, IPC 2012.] |
| 01/25/2016 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed. [Third comment: Comment not resolved.] [Second comment: Comment not resolved; the envelope components do not correspond to the drawings (e.g. multiple window and wall types are not included in the COMcheck analysis).] [Initial comment: Portions of the building shell being modified in this activity do not appear to have been previously conditioned. Section R101.4.5, IECC 2012 requires these spaces to be brought into full compliance with the current energy code. Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections R103.2 and R401.2, International Energy Conservation Code 2012.] 2. Comment not addressed. [Third comment: Comment not resolved.] [Second comment: Coordinate the load calculations with the unit tag numbers on the drawings and show how the U-values of the walls were determined.] [Initial comment: Revise the heating and cooling load calculations used to justify the capacities of the heating and cooling equipment specified for the project by coordinating the wall construction used in the calculations with the wall construction shown on the architectural drawings. Reference: Section R403.6, IECC 2012, and Section 312.1, IMC 2012.] 3. Comment not addressed. [Third comment: Show the ventilation calculations and the operating parameters for the whole house ventilation.] [Second comment: Section R403.5, IECC 2012 requires mechanical ventilation, not natural ventilation.] [Initial comment: Clarify how mechanical ventilation is to be provided to each loft. Reference: Section R403.5, IECC 2012 and Section 403.3, IMC 2012.] |
| 02/01/2016 | AROMERO4 | ENGINEERING | REVIEW | Needs Review | |
| 02/01/2016 | AROMERO4 | ZONING | REVIEW | Needs Review |