Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T15CM01791
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/20/2015 | KEN BROUILLETTE | FIRE | REVIEW | Reqs Change | TFD needs the DP comments addressed before we can approve this project. 2ND REVIEW |
| 07/24/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Exception 1 of Section C101.5.2, IECC 2012 exempts buildings that use less than 1.0 Watt per square foot of floor area for space conditioning from the building thermal envelope requirements of the 2012 IECC. Provide calculations to show that the total energy use of the three evaporative coolers and the packaged terminal heat pump is less than 7500 Watts. [Initial comment: Provide energy code compliance calculations for the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C103.2 and C401.2, International Energy Conservation Code 2012.] 2. Comment not addressed. [Initial comment: Provide NFRC fenestration product ratings for the U-factor and the SHGC values on COMcheck or use the appropriate default U-factor and SHGC values from Tables C303.1.3 (1), C303.1.3 (2) and C303.1.3.(3), IECC 2012. Reference: Section C303.1.3, IECC 2012.] |
| 07/24/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Key note 10.9 on sheet A1.0 states that the point-of-use water dispenser is not in the contract ("NIC"). If a point-of-use water dispenser is being used in lieu of the required drinking fountains, it must be installed as part of this activity and the architect shall also indicate where the required accessible cup dispenser is to be located. [Initial comment: Provide the minimum plumbing facilities required by Table 2902.1, IBC 2012, for business occupancy (a bottled water dispenser is not recognized as a substitute for a drinking fountain). Reference: Sections 1109.5 and 2902.1, IBC 2012.] |
| 07/28/2015 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: T15CM01791 2865 E. Ginter Road Building plans for a Warehouse/Storage TRANSMITTAL DATE: July 28, 2015 DUE DATE: August 11, 2015 COMMENTS: 01. Zoning has reviewed the building plans but cannot approve them at this time. While the building size and height is consistent with what is depicted on the current version of the Development Package, the development package must be fully approved before zoning can sign off on the building plans as it relates to the zoning review purview of the building. 02. If a copy of the development package is to be included in the building package, ensure that it is an approved and PDSD signed off copy. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. |
| 08/03/2015 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 08/10/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. SHEET TS1; CODE STUDY (#4a): THE SPRINKLERS REFERENCE TABLE 1016.2. PLEASE REVISE THAT REFERENCE (SECTION 406.8.6). 2. PREVIOUS COMMENT 7; SHEET TS1; CODE STUDY (#5B SHOULD BE 6): THE OCCUPANT LOADS REFERENCES TABLE 1016.2. PLEASE REVISE THAT REFERENCE (TABLE 1004.1.2). WHERE DID THE 200 SF/OCCUPANT COME FROM? 3. PREVIOUS COMMENT 9; SHEET TS1: PLEASE INDICATE IN THE RESPONSES THAT THE REQUIREMENTS OF THE IBC SECTION 406.8 HAVE BEEN REVIEWED, SPECIFICALLY THE ISSUES OF VENTILLATION (SECTION 1203), FLOOR SURFACE (SECTION 406.8.3), AND HEATING EQUIPMENT (SECTION 1204). 4. GENERAL: SHEET S3.0 WAS NOT INCLUDED IN ONE SET. PLEASE PROVIDE TWO COMPLETE SETS. 5. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |