Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T15CM01487
Parcel: 13323099K

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T15CM01487
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/04/2015 LOREN MAKUS ENGINEERING REVIEW Approved
03/05/2015 RSHERRY1 WWM REVIEW Passed No water meter size change.
03/05/2015 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
03/05/2015 AROMERO4 PLUMBING-COMMERCIAL REVIEW Needs Review
03/05/2015 ROBERT SHERRY WATER REVIEW Completed
03/05/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Demonstrate energy code compliance for the alterations to the building envelope based on the current code. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012.
2. Provide NFRC fenestration (i.e. doors and windows) product ratings for the U-factor and the SHGC values on COMcheck or use the appropriate default U-factor and SHGC values from Tables C303.1.3 (1), C303.1.3 (2) and C303.1.3.(3), IECC 2012. Reference: Section C303.1.3, IECC 2012.
3. The occupant load used to calculate the required ventilation is not necessarily the same as the occupant load used for calculating exiting requirements. The occupant load used for calculating the minimum required ventilation is to be based on Table 403.3, IMC 2012 or an approved engineering analysis of the specific occupancy type (i.e. provide an appeal to the building official). Reference: Section 403.3, IMC 2012.
03/05/2015 MARTIN BROWN FIRE REVIEW Approved
03/05/2015 AROMERO4 ELECTRICAL-COMMERCIAL REVIEW Needs Review
03/05/2015 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. GENERAL: PLEASE PROVIDE THE PLUMBING FIXTURE ANALYSIS ON THE PLAN.
2. SHEET A-3; NEW WALL KEYNOTES (NOTE A): PLEASE PROVIDE THE WALL STUD SPACING ON THE PLAN.
3. SHEET A-3; FLOOR PLAN: PLEASE PROVIDE A SHEET SHOWING THE MILLWORK ELEVATIONS AS INDICATED ON THE PLANS.
4. SHEET A-4; ROOM FINISH LEGEND: PLEASE FINISH THE PAINT SCHEDULE.
5. GENERAL: PLEASE PROVIDE THE SHEET IN THE SET OF PLANS WITH THE NORTH AND SOUTH ELEVATIONS.
6. GEMERAL: PLEASE PROVIDE STRUCTURAL CALCULATIONS FOR THE NEW MECHANICAL UNITS ON THE ROOF, INDICATING THE EXISTING STRUCTURE CAN SAFELY SUPPORT THOSE UNITS.
7. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
03/05/2015 DAVID RIVERA ZONING REVIEW Approved