Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T15CM01487
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/04/2015 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 03/05/2015 | RSHERRY1 | WWM | REVIEW | Passed | No water meter size change. |
| 03/05/2015 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 03/05/2015 | AROMERO4 | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
| 03/05/2015 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 03/05/2015 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Demonstrate energy code compliance for the alterations to the building envelope based on the current code. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012. 2. Provide NFRC fenestration (i.e. doors and windows) product ratings for the U-factor and the SHGC values on COMcheck or use the appropriate default U-factor and SHGC values from Tables C303.1.3 (1), C303.1.3 (2) and C303.1.3.(3), IECC 2012. Reference: Section C303.1.3, IECC 2012. 3. The occupant load used to calculate the required ventilation is not necessarily the same as the occupant load used for calculating exiting requirements. The occupant load used for calculating the minimum required ventilation is to be based on Table 403.3, IMC 2012 or an approved engineering analysis of the specific occupancy type (i.e. provide an appeal to the building official). Reference: Section 403.3, IMC 2012. |
| 03/05/2015 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 03/05/2015 | AROMERO4 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 03/05/2015 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. GENERAL: PLEASE PROVIDE THE PLUMBING FIXTURE ANALYSIS ON THE PLAN. 2. SHEET A-3; NEW WALL KEYNOTES (NOTE A): PLEASE PROVIDE THE WALL STUD SPACING ON THE PLAN. 3. SHEET A-3; FLOOR PLAN: PLEASE PROVIDE A SHEET SHOWING THE MILLWORK ELEVATIONS AS INDICATED ON THE PLANS. 4. SHEET A-4; ROOM FINISH LEGEND: PLEASE FINISH THE PAINT SCHEDULE. 5. GENERAL: PLEASE PROVIDE THE SHEET IN THE SET OF PLANS WITH THE NORTH AND SOUTH ELEVATIONS. 6. GEMERAL: PLEASE PROVIDE STRUCTURAL CALCULATIONS FOR THE NEW MECHANICAL UNITS ON THE ROOF, INDICATING THE EXISTING STRUCTURE CAN SAFELY SUPPORT THOSE UNITS. 7. GENERAL: PLEASE PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 03/05/2015 | DAVID RIVERA | ZONING | REVIEW | Approved |