Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T15CM01394
Parcel: 10602265B

Address:
320 W PRINCE RD

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T15CM01394
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/06/2015 MARTIN BROWN FIRE REVIEW Approved
04/10/2015 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approved
04/10/2015 RONALD BROWN COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
04/16/2015 STEVE SHIELDS ZONING REVIEW Approved
04/17/2015 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
04/20/2015 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide energy code compliance calculations for the additions to the building envelope; use the climate zone for Tucson. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections C101.4.3, C101.5, and C103.2, International Energy Conservation Code 2012.
2. Provide NFRC fenestration product ratings for the U-factor and the SHGC values on COMcheck or use the appropriate default U-factor and SHGC values from Tables C303.1.3 (1), C303.1.3 (2) and C303.1.3.(3), IECC 2012. Reference: Section C303.1.3, IECC 2012.
3. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections C403.2.1 and C403.2.2, IECC 2012, and Section 312.1, IMC 2012.
04/20/2015 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Section 301.2, IPC 2012.
2. Provide secondary (overflow) roof drainage. Reference: Sections 1101, 1106 and 1108, IPC 2012, and Sections 1611.1 and 1611.3, IBC 2012.
04/20/2015 ROBERT SHERRY WATER REVIEW Reqs Change The water calculations appear to indicate that a new 2" water meter is to be installed along with a new 3" reduced pressure backflow prevention assembly to accommodate a demand of only 59 GPM. If this is correct, what is the size of the existing water meter? If the existing water meter is to be retained, provide the meter size and serial number.
04/27/2015 AROMERO4 WWM REVIEW Completed
04/29/2015 LOREN MAKUS ENGINEERING REVIEW Approved