Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/WWM
Permit Number - T15CM00972
Review Name: RESIDENTIAL - BLDG/WWM
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/22/2015 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Reqs Change | T15CM00922 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, please provide two sets of updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2012 International Residential Code and 2012 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL COMMENTS: 1. Inclusive Home Design Ordinance adopted by the City of Tucson Ordinance #10463 on 10/16/2007. In addition to the accessible door with a maximum ½" threshold height and; 30" minimum net interior door width and 2"x6" blocking at the toilet, tub and shower 36" above floor, clarify the requirement for lever-type door hardware and electrical outlet reachable range of 15" - 48" above floor. SECTIONS - DETAILS: 1. Provide consistent material and size references, R106.1.1. Update the exterior wall insulation R-value at the insulation notation, sheet #A1.1. 2. Provide consistent information for the unvented conditioned attic space, R806. Update the R-value at detail #11/S4. 3. If the unvented roof assembly method will be utilized then specify a layer of air-impermeable rigid insulation material (rigid board or closed cell spray) tight to the roof sheathing with a minimum R-5 value, R806.5. This condensation control provision is necessary for code compliance and may be layered with batt insulation for achieving the total required roof R value. Clarify detail #1/A2. PLUMBING PLANS: 1. Provide a gas (1,000 BTUh = 1 CFH) conversion coordinated with Southwest Gas. Update the Gas Demand Schedule, sheet P1. 2. Show gas pipe sizes in compliance with connected demand, G2413.3 & Table G2413.4(1). Clarify the pipe length between the meter and range/oven 40' or 23'. A ¾" branch line is needed for demands greater than 81,000 BTUh at 40'. If you have any questions please contact: Ken Van Karsen (520) 837-4912 City of Tucson Residential Plan Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/24/2015 | KROBLES1 | OUT TO CUSTOMER | Completed |